My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 44 - Agreement for Construction Management, Inspection Services, and Improvements for the Well 29 Rehabilitation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 44 - Agreement for Construction Management, Inspection Services, and Improvements for the Well 29 Rehabilitation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 12:09:45 PM
Creation date
8/15/2023 9:02:21 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
44
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix <br />ATTACHMENT 1 <br />SCOPE OF WORK <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />WELL 29 REHABILITATION IMPROVEMENTS CONSTRUCTION <br />MANAGEMENT AND INSPECTION SERVICES <br />RFP NO.21-135 <br />INTRODUCTION/PROJECT DESCRIPTION <br />The City desires to engage a professional consultant to perform Construction Engineering <br />and Management Services for the Well 29 Rehabilitation Improvements Project. The <br />consultant shall provide general Construction Management services to support the <br />construction efforts and serve as an extension of City staff to assist in the overall delivery <br />of this project, including pre -construction tasks, managing construction and ensuring that <br />the work is completed in accordance with the contract documents, and project closeout and <br />commissioning phase. The consultant team will report directly to the City's Construction <br />Manager or his authorized representative. City staff may assist in managing construction <br />and will oversee the work of the Project Manager, Inspector, and Contract Administrator. <br />The Well 29 Rehabilitation Improvements Project: <br />The estimated construction cost for the Well 29 Rehabilitation Improvements Project is $6 <br />million. The City anticipates advertising construction bids in the early winter 2021, and <br />starting construction by early 2022. Total construction duration for the project is <br />anticipated to be 14 months. <br />The general scope of the project includes but is not limited to the following: <br />• Well rehabilitation <br />• Pavement and concrete work <br />• Mechanical System <br />• New Building Construction <br />• Water service and pipelines <br />• Pump and motor improvements <br />• Irrigation and landscaping <br />• Electrical System <br />• Building upgrades and modification <br />• MCC cabinet replacement <br />• Site Improvements; paving, concrete sidewalk, etc. <br />• Road paving <br />• System Controls and Instrumentation <br />City of Santa Ana RFP 21-135 <br />Page Al-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.