My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 44 - Agreement for Construction Management, Inspection Services, and Improvements for the Well 29 Rehabilitation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 44 - Agreement for Construction Management, Inspection Services, and Improvements for the Well 29 Rehabilitation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 12:09:45 PM
Creation date
8/15/2023 9:02:21 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
44
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant Services: <br />The required services by the Project Manager, the Inspector and the Contract Administrator <br />may include the following: <br />The PM shall be a registered engineer in the State of California and shall represent the City <br />Construction Manager in the field. The CM shall possess a minimum of (5) years' <br />experience in construction management. The Inspector and the Contracts Administrator <br />should have relevant experience in construction management and certifications that affirm <br />the experience. <br />2. Prior to the start of the project, the PM shall be responsible for conducting a bid analysis <br />to determine who the lowest responsible bidder for the project will be. Shall obtain <br />certificates of insurance, performance bond and "New Vendor Packet" requirements have <br />been satisfied. This includes verifying that all sub -contractors have a valid City Business <br />License. Once determined, a staff report will need to be generated to recommend the award <br />of a Construction Contract. <br />3. The PM shall be responsible for review of completeness and quantity of all required shop <br />drawings, product data, samples and other submittals ("Submittals"). Shall transmit the <br />Submittals to City staffing for review and approval, and shall establish and implement <br />procedures for expediting the processing and approval of Submittals. <br />4. Attend pre -construction meeting and schedule and conduct weekly construction and <br />progress meetings to discuss such matters as procedures, progress, problems and <br />scheduling. Will prepare and promptly distribute minutes. <br />5. Shall be responsible for ensuring that all building permits, special permits, if required are <br />obtained, and that all applicable fees have been paid, and shall obtain approvals from <br />authorities having jurisdiction over the Project. <br />6. Shall review construction schedule, including activity sequences and duration, schedule of <br />submittals and schedule of delivery for products with long lead-time. Update the project <br />schedule as required showing current conditions and revisions required by actual progress. <br />7. Shall conduct comprehensive evaluation of change order requests, provide independent <br />estimates, render recommendations and assist in claim resolution. Shall regularly monitor <br />and report on the status of the Project Construction Budget on a monthly basis, indicating <br />actual costs for completed activities and work in progress, and indicating estimates for <br />uncompleted work. Report should identify variances between actual and budgeted or <br />estimated costs, and shall advise the City whenever it appears that the Actual Construction <br />Cost has exceeded, or will exceed, the Project Construction Budget for the entire Project <br />or any Project Component. <br />8. Monitor the contractor's safety program. Take necessary steps to ensure the jobsite <br />conditions are in compliance with OSHA regulations. <br />City of Santa Ana RFP 21-135 <br />Page Al-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.