Laserfiche WebLink
equipment; the installation of pressurized potable, inlet <br />manifold, pressure, and drain pipings; and various <br />other item for a complete and functioning potable water <br />storage system. <br />Year Completed: 2021 '1,1" 1 Fe( $582,344 <br />Team: Pat Riddell - Project Manager <br />Reference Ditas Esperanza, PE <br />Capital Projects Engineer <br />Paso Robles, 1000 Spring Street <br />Paso Robles, CA 93446 <br />2 805.237.3861 �Z DEsperanza@prcity.com <br />e. Relevant Project Experience & f. References <br />Construction Management and Inspection Services for Well No. <br />Crescents Volley Water District, Lo Crescents, Calfornia <br />-escenta Valley Water District design changes as needed based on field conditions <br />Selected Cannon to provide and CVWD's requested changes or additions; <br />construction management coordination of material testing; and management of <br />of the installation of the contract change orders. <br />necessary facilities for Well <br />No. 2. The scope of work <br />cluded weekly progress <br />meetings with agendas and <br />minutes; coordination with CVWD, the contractor, <br />design engineer, and City of Glendale; keeping <br />complete and organized construction files using <br />Procore; daily site observation/inspection with daily <br />reports; review and response to RFls; exhibits for <br />Year Completed: 2019 , , $282,951 <br />Team: Pat Riddell - Construction Manager <br />RPf-rPnrF David Gould, PE, District Engineer <br />Crescenta Valley Water District, 2700 Foothill Blvd. <br />La Crescenta, CA 91214 <br />2818.248.3925 �-K dgould@cvwd.com <br />This project was the recipient of the American Society <br />of Civil Engineers Outstanding Water Project of the <br />Year and Water Treatment Project of the Year 2019 <br />Construction Management of West Main Tank <br />Paso Robles, Calfornia <br />ie City required the replacement equipment and various SCADA and electrical <br />)f an unconventionally -shaped <br />earthen reservoir with a new <br />4.0 MG partially buried pre- <br />stressed concrete tank facility <br />and selected Cannon to provide <br />onstruction management <br />services for this project, including <br />construction observation, materials engineering, and <br />sampling and testing throughout construction. This <br />consists of the construction of a 4 MG partially buried <br />pre -stressed concrete tank, including appurtenances <br />such as ladders, hatches, railing, air vent, safety <br />I <br />Ad <br />