My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 44 - Agreement for Construction Management, Inspection Services, and Improvements for the Well 29 Rehabilitation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 44 - Agreement for Construction Management, Inspection Services, and Improvements for the Well 29 Rehabilitation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 12:09:45 PM
Creation date
8/15/2023 9:02:21 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
44
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
equipment; the installation of pressurized potable, inlet <br />manifold, pressure, and drain pipings; and various <br />other item for a complete and functioning potable water <br />storage system. <br />Year Completed: 2021 '1,1" 1 Fe( $582,344 <br />Team: Pat Riddell - Project Manager <br />Reference Ditas Esperanza, PE <br />Capital Projects Engineer <br />Paso Robles, 1000 Spring Street <br />Paso Robles, CA 93446 <br />2 805.237.3861 �Z DEsperanza@prcity.com <br />e. Relevant Project Experience & f. References <br />Construction Management and Inspection Services for Well No. <br />Crescents Volley Water District, Lo Crescents, Calfornia <br />-escenta Valley Water District design changes as needed based on field conditions <br />Selected Cannon to provide and CVWD's requested changes or additions; <br />construction management coordination of material testing; and management of <br />of the installation of the contract change orders. <br />necessary facilities for Well <br />No. 2. The scope of work <br />cluded weekly progress <br />meetings with agendas and <br />minutes; coordination with CVWD, the contractor, <br />design engineer, and City of Glendale; keeping <br />complete and organized construction files using <br />Procore; daily site observation/inspection with daily <br />reports; review and response to RFls; exhibits for <br />Year Completed: 2019 , , $282,951 <br />Team: Pat Riddell - Construction Manager <br />RPf-rPnrF David Gould, PE, District Engineer <br />Crescenta Valley Water District, 2700 Foothill Blvd. <br />La Crescenta, CA 91214 <br />2818.248.3925 �-K dgould@cvwd.com <br />This project was the recipient of the American Society <br />of Civil Engineers Outstanding Water Project of the <br />Year and Water Treatment Project of the Year 2019 <br />Construction Management of West Main Tank <br />Paso Robles, Calfornia <br />ie City required the replacement equipment and various SCADA and electrical <br />)f an unconventionally -shaped <br />earthen reservoir with a new <br />4.0 MG partially buried pre- <br />stressed concrete tank facility <br />and selected Cannon to provide <br />onstruction management <br />services for this project, including <br />construction observation, materials engineering, and <br />sampling and testing throughout construction. This <br />consists of the construction of a 4 MG partially buried <br />pre -stressed concrete tank, including appurtenances <br />such as ladders, hatches, railing, air vent, safety <br />I <br />Ad <br />
The URL can be used to link to this page
Your browser does not support the video tag.