Pinewood Plant Reservoir and Booster Pump Station
<br />Golden State Water Company, Tonglewood (Orcutt), Colifornio
<br />^annon provided construction
<br />nspection, construction
<br />coordination, submittal, and
<br />RFI review services for the
<br />installation of a 0.238 million
<br />gallon steel reservoir (42' D x
<br />30' H), booster pump station,
<br />generator, and sound -attuning
<br />fence in Santa Barbara County. The reservoir and
<br />booster pump station are at the site of an existing
<br />Golden State Water Company (GSWC) well serving
<br />the Tanglewood community in northern Santa Barbara
<br />Groves Booster Pump Station
<br />Golden State Water Company, Orcutt, Colifornio
<br />Iden State Water Company
<br />'7SWC) selected Cannon
<br />to provide construction
<br />inspection services for the
<br />Greenfield Booster Pump
<br />>tation, which includes civil/
<br />work of the new facility site;
<br />the construction of a booster pump
<br />station; installation of generator; and instrumentation
<br />and SCADA commissioning. Cannon's scope of work
<br />involved professional services in one phase, including
<br />attendance at the pre -construction conference,
<br />review of contractor submittals, support of GSWC
<br />on contractor requests for information; coordination
<br />La Brea Transmission Main Project
<br />Beverly Hills, Colfornio
<br />T" ; project included water line
<br />3tallation through portions of
<br />he City of Beverly Hills and
<br />the City of Los Angeles to
<br />deliver well water to the City's
<br />-eatment facility. The City used
<br />nchless installation techniques
<br />to install 2,300 linear feet of
<br />18-inch C900 PVC DR18 with fused joints into an
<br />existing 24-inch steel pipe in residential streets, as well
<br />as 7,000 linear feet of 14-inch C900 PVC DR 18 with
<br />fused joints into an existing 18-inch abandoned water
<br />main along La Cienega Blvd. For this project, Cannon
<br />County. The booster pump station consists of four
<br />pumps, ranging from 15 to 75 HP. Reservoir includes
<br />subdrain system, steel stairway, and various hatches,
<br />cleanouts, and piping attachments. The steel reservoir
<br />is protected by a cathodic protection system consisting
<br />of (6) 13' long magnesium rod anodes suspended from
<br />the tank roof.
<br />Year Completed: 2019 CM&I Fee $123,408
<br />Team- Pat Riddell - Principal -in -Charge
<br />Reference: Karl Saluta, Contract Manager
<br />Golden State Water Company, 2330 A Street, Suite A
<br />Santa Maria, CA, 93455
<br />2909-305-5427 x333 (� Karl.Saluta@gswater.com
<br />with the contractor regarding ongoing construction
<br />schedule; and inspection services for onsite work
<br />as proposed in the plans and specifications,
<br />including inspection of foundation, tank, coatings,
<br />cathodic protection system, and safety and structural
<br />modifications, booster pump station, and generator
<br />install by qualified personnel.
<br />Year Completed: 2020 CM&I Fer $106,950
<br />Team: Pat Riddell - Project Manager, Ali Etezadkhah -
<br />Electrical Inspection
<br />Reference. Karl Saluta, Contract Manager, GSWC,
<br />2143 Convention Center Way, Suite 110
<br />Ontario, CA 91764
<br />2805.349.7407 Z Karl.Saluta@gswater.com
<br />provided Construction Inspection services and worked
<br />with the City of Beverly Hills Project Manager and
<br />Project Inspector to train staff and provide inspection
<br />services on the fusing of pipe joints and slip -lining
<br />installation processes and procedures.
<br />Year 2021 $19,213
<br />Team: Pat Riddell - Project Manager
<br />Reference: Tristan Malabanan, PE, Civil Engineer