My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 44 - Agreement for Construction Management, Inspection Services, and Improvements for the Well 29 Rehabilitation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 44 - Agreement for Construction Management, Inspection Services, and Improvements for the Well 29 Rehabilitation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 12:09:45 PM
Creation date
8/15/2023 9:02:21 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
44
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Caltrans Experience <br />With Cannon's extensive experience in completing <br />transportation improvement projects, we have <br />naturally developed an excellent working relationship <br />with Caltrans in Central and Southern California <br />(Districts 5 and 7). The following projects required <br />coordination with Caltrans for design approvals, Right - <br />of -Way encroachment permits, agency coordination, <br />construction oversight, and/or funding administration. <br />• Construction Management for U.S. Highway 101 <br />and State Route 46 East Improvements, Paso <br />Robles, California <br />• Construction Management for Highway 1 Sidewalk <br />and Drainage Improvements, Guadalupe, California <br />• Design and Construction Management for South <br />Vine Street Improvements, Paso Robles, California <br />• Intersection Improvements at Central Avenue and H <br />Street (Highway 1), Lompoc, California <br />• Construction Management for U.S. Highway 101/ <br />State Route 46 East Interchange and Theatre Drive <br />Realignment, Paso Robles, California <br />• Highway 227 and Tank Farm Road Widening, San <br />Luis Obispo, California <br />• Funding Administration for El Camino Real / Carmel <br />Road Widening — Highway Safety Improvement <br />Program (HSIP), County of San Luis Obispo, <br />California <br />Resources PIMCURE <br />Cannon's experience <br />and familiarity with <br />Procore means that all project documents, drawings, <br />contract change orders, contractor submittals, shop <br />drawings, and correspondence will be maintained in <br />electronic form and hard copy. Submittals, RFIs, and <br />other documents will be maintained using PROCORE, <br />a cloud -based project management software. We <br />will maintain an "as current" basis, a record copy of <br />all contracts, drawings, specifications, addenda, and <br />change orders in good order. <br />Procore Technologies, Inc., is a leading provider of <br />cloud -based applications for construction. Procore <br />Construction OS connects people, applications, <br />and devices through a unified platform that helps <br />construction firms manage risk and build quality <br />projects, safely, on time, and within budget. Procore <br />has a diversified business model with products for <br />Construction Project Management, Construction <br />Financials, and Quality & Safety. <br />Procore helps firms drastically increase project <br />efficiency and accountability by streamlining <br />and mobilizing project communications and <br />documentation. This real time data and accessibility <br />minimizes costly risks and delays —ultimately boosting <br />profits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.