My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 44 - Agreement for Construction Management, Inspection Services, and Improvements for the Well 29 Rehabilitation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 44 - Agreement for Construction Management, Inspection Services, and Improvements for the Well 29 Rehabilitation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 12:09:45 PM
Creation date
8/15/2023 9:02:21 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
44
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana Cannon <br />Well 29 Rehabilitation Improvements 1050 Southi Dive <br />Cannon Construction Management and Inspection Services RFP No.: 21-135 San Luis Obispo, CA 93401 <br />805,544.7407 <br />Pat Riddell Harry Heneln_iJameson <br />Principle in Charge Resident liwi <br />$195 $a■� <br />Task Hrs. Cost Hre <br />Farr/John Omelos Dereck Romero Matt Cook <br />Construction Electrical <br />Inspector design/Submittals Electrical Inspector <br />$140 $185 $140 <br />Cost Hrs. Cost Hrs. <br />Toby Tonnage Toby Tonnage Kyle Askarian Esther Lopez Christine Kahn <br />Design/Submittals DesinerlBuilding Office Engineer/Alternate Project Construction <br />Review Mecnical Inspector Inspector Adminslrator Adminstrator/Assists <br />$185 $140 $140 $98 $165 <br />Cost Hrs. Cost Hrs. Cost Hrs. Cost Hrs. Cost Hrs. Cost <br />Estimated <br />Cannon Estimated <br />Hours Cost <br />Moll <br />Pe clorm Bid Analysis to determine the Lomst Responsible Bidder <br />1.2 <br />3 Reserve ' Revim Contractor Paper Work <br />Pre-ConstIn <br />IN <br />Con <br />. Documentation12 <br />Safety and Traffic Management <br />2.3 Schedule and Progress <br />2.4 Submittals and Requests for Information (RFIa) <br />2.7 Control of Materials <br />Control Management <br />Po3 <br />o0mm00moo���� <br />2 As -Built Record Drawings <br />3 3 Final Project Records <br />KFrillir <br />0 <br />:•„r <br />®�0 <br />:•r rr <br />m <br />r „r <br />��® <br />:,r rr <br />i <br />Reimbursables <br />Rainbuirsaidesrelated to processing RFI, a <br />j Estimated Costa <br />Subconsultant Estimated Cost <br />rrr <br />TOTAL $489,741 <br />'Note: <br />Fee Schedule is based on 260 working days. <br />If the project working days Will increase due to currently unknown factors, additional fees will be added based on T&M Basis. <br />This fee schedule does not include any overtime work. If authorrized by the City, Overtime work shall be extra and based on T&M Basis <br />Public Outreach is optional and its fees/value shall be on T&M Basis. <br />Labor Compliancveis optional and its fees/value shall be on T&M Basis. <br />Claims Assistance optional and its fees/value shall be on T&M Basis. <br />Warrnty Work fees/value shall be based on T&M Basis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.