My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 44 - Agreement for Construction Management, Inspection Services, and Improvements for the Well 29 Rehabilitation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 44 - Agreement for Construction Management, Inspection Services, and Improvements for the Well 29 Rehabilitation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 12:09:45 PM
Creation date
8/15/2023 9:02:21 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
44
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cannon <br />Assistant Resident Engineer <br />$ <br />135 <br />$ <br />163 <br />Associate Engineer <br />$ <br />140 <br />$ <br />195 <br />Associate Landscape Architect <br />$ <br />145 <br />$ <br />170 <br />Associate Planner <br />$ <br />140 <br />$ <br />173 <br />Automation Design/Project Engineer <br />$ <br />115 <br />$ <br />152 <br />Automation Specialist <br />$ <br />135 <br />$ <br />160 <br />Automation Technician <br />$ <br />95 <br />$ <br />120 <br />CAD Tech <br />$ <br />85 <br />$ <br />110 <br />CAD Manager <br />$ <br />100 <br />$ <br />130 <br />Construction Inspector I - III <br />$ <br />110 <br />$ <br />142 <br />Construction Manager <br />$ <br />155 <br />$ <br />180 <br />Controller <br />$ <br />70 <br />$ <br />116 <br />Design Engineer <br />$ <br />110 <br />$ <br />153 <br />Director <br />$ <br />180 <br />$ <br />235 <br />Engineer Tech <br />$ <br />98 <br />$ <br />117 <br />Engineering Assistant I - 11 <br />$ <br />80 <br />$ <br />113 <br />Engineering Manager <br />$ <br />210 <br />$ <br />250 <br />Grant Funding Manager I - II <br />$ <br />130 <br />$ <br />171 <br />I&E Services Coordinator <br />$ <br />80 <br />$ <br />105 <br />Information Systems Admin/Manager <br />$ <br />75 <br />$ <br />121 <br />Land Surveyor I - V <br />$ <br />150 <br />$ <br />207 <br />Landscape Architect <br />$ <br />105 <br />$ <br />125 <br />Landscape Designer I - 11 <br />$ <br />80 <br />$ <br />123 <br />Lead Automation Specialist <br />$ <br />147 <br />$ <br />175 <br />Lead Automation Technician <br />$ <br />105 <br />$ <br />140 <br />Lead Designer <br />$ <br />100 <br />$ <br />144 <br />Marketing Manager / Director <br />$ <br />125 <br />$ <br />158 <br />Office Engineer / Construction I - III <br />$ <br />98 <br />$ <br />135 <br />Plan Check Engineer I - III <br />$ <br />120 <br />$ <br />188 <br />Planner I - III <br />$ <br />83 <br />$ <br />125 <br />Planning Assistant 1 <br />$ <br />55 <br />$ <br />74 <br />Principal Construction Engineer <br />$ <br />185 <br />$ <br />205 <br />Principal Designer <br />$ <br />110 <br />$ <br />157 <br />Principal Engineer <br />$ <br />170 <br />$ <br />218 <br />Other Direct Charges <br />Black Line Plots <br />$2.00 per page <br />Outside Reproduction <br />Cost + 15% <br />Automation & Electrical Materials <br />Cost + 15% (+tax) <br />Subconsultant Fees <br />Cost + 5% <br />2022-2024 Rates Range <br />Bill Rate Ranges <br />Subject to change <br />Project Designer $ 83 - $ 139 <br />Project Engineer <br />$ <br />120 <br />$ <br />167 <br />Project Manager/Sr. Principal <br />$ <br />195 <br />$ <br />231 <br />Resident Engineer <br />$ <br />155 <br />$ <br />193 <br />Sr. Associate Engineer <br />$ <br />150 <br />$ <br />210 <br />Sr. Automation Specialist <br />$ <br />163 <br />$ <br />190 <br />Sr. Automation Technician <br />$ <br />126 <br />$ <br />155 <br />Sr. CAD Tech <br />$ <br />90 <br />$ <br />120 <br />Sr. Construction Manager <br />$ <br />180 <br />$ <br />210 <br />Sr. Consultant / Principal -in -Charge <br />$ <br />185 <br />$ <br />285 <br />Sr. Land Surveyor <br />$ <br />171 <br />$ <br />232 <br />Sr. Landscape Architect <br />$ <br />153 <br />$ <br />185 <br />Sr. Plan Check Engineer <br />$ <br />130 <br />$ <br />188 <br />Sr. Planner <br />$ <br />153 <br />$ <br />185 <br />Sr. Principal Designer <br />$ <br />110 <br />$ <br />162 <br />Sr. Principal Engineer <br />$ <br />180 <br />$ <br />260 <br />Sr. Project Designer <br />$ <br />105 <br />$ <br />152 <br />Sr. Project Engineer <br />$ <br />130 <br />$ <br />180 <br />Sr. Project Manager <br />$ <br />190 <br />$ <br />245 <br />Sr. Resident Engineer <br />$ <br />172 <br />$ <br />205 <br />Structures Representative <br />$ <br />165 <br />$ <br />191 <br />Survey Manager <br />$ <br />195 <br />$ <br />255 <br />Survey Technician I - VI <br />$ <br />105 <br />$ <br />188 <br />Technical Writer I - IV <br />$ <br />90 <br />$ <br />145 <br />Survey Crew Rates - Regular <br />One -Man Field $ 180 - $ 197 <br />Two -Man Field <br />Three -Man Field <br />Two -Man - HDS <br />Survey Crew Rates - Prevailing Wage <br />One -Man Field <br />$ <br />255 <br />$ <br />279 <br />$ <br />335 <br />$ <br />366 <br />$ <br />295 <br />$ <br />322 <br />$ <br />230 <br />$ <br />247 <br />Two -Man Field $ 305 $ 329 <br />Three -Man Field $ 435 $ 450 <br />Electrical - Prevailing Wage <br />Electrician $ 110 - $ 194 <br />CM - Prevailing Wage <br />BCI Construction Inspector $ 145 - $ 165 <br />Forensics Engineering / Expert Testimony Fee Schedule Available Upon Request. <br />Color Plots $5.00 per page <br />Travel and Related Subsistence Cost + 15% <br />Standard Mileage Rate IRS Rate per mile <br />Airplane Mileage Rate GSA Rate per mile <br />All of the above hourly rates include all direct labor costs and labor overhead, general and administrative expenses and profit. All direct expenses, such as special <br />equipment, shipping costs, travel other than by automobile, parking expenses, and permit fees will be billed at the actual cost plus 15%. If the client requests, or the client's <br />schedule requires work to be done on an overtime basis, a multiplier of 1.5 will be applied to the stated rates for weekdays for daily hours in excess of 8 as well as <br />weekends and a multiplier of 2.0 for daily hours in excess of 12 and holidays. If the client requests field services to be provided outside of normal working hours (between <br />6:00 p.m. and 6:00 a.m.), a multiplier of 1.5 will be applied to the stated rates. For prevailing wage projects, if the client requests field services to be provided on any given <br />Sunday, a multiplier of 2.0 will be applied to the stated rates and on or around an observed holiday, other rates may be applied. Survey Crews and Automation Field staff <br />are billed portal to portal, and mileage charges are included in the hourly rate. A minimum charge of 4 hours will be charged for any Automation Field Service calls outside <br />of normal working hours (between 6:00 p.m. and 6:00 a.m.). The stated rates are subject to change, typically on <br />an annual basis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.