My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 62 - Pre-Commitment of Affordable Housing Funds for Jamboree Housing Corporation and WISEPlace
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 62 - Pre-Commitment of Affordable Housing Funds for Jamboree Housing Corporation and WISEPlace
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 9:47:21 AM
Creation date
8/15/2023 9:46:24 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
62
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pre-Commitment of Affordable Housing Funds for Jamboree and WISEPlace <br />June 21, 2022 <br />Page 12 <br />2 <br />7 <br />6 <br />5 <br />structured with a 55-year term and a 1% simple interest rate. The loan repayments were <br />to be made from 50% of the project’s residual receipts. <br />In 2001, the City amended the terms of the CDBG Loan. At that time, the outstanding <br />principal balance of the loan was set at $916,265, which consisted of two components: <br />(1) a $250,000 component, and (2) a $666,616 component. The amended promissory <br />note set the loan term at 55 years – starting in 2002 and ending in 2056. The interest <br />rate was set at 1% and was applied to the $666,265 component of the CDBG Loan, which <br />resulted in annual interest payment of $6,662.65 per year. <br />WISEPlace was required to make interest only payments of $6,662.65 per year for the <br />55-year loan term. However, as long as the project was not in default, the amended <br />promissory note required the City to forgive $16,666 of the CDGB Loan per year for the <br />first 15 years. This resulted in $250,000 of the $916,265 CDBG Loan being forgiven. The <br />current outstanding loan balance is currently $723,446.41. Per the terms of the amended <br />promissory note, WISEPlace is required to continue paying annual interest only payments <br />until the end of the loan term in 2056. The entire balance of the CDBG Loan ($723,446.41 <br />plus interest) will become due and payable at that time. <br />The current financial structure of the Project requires WISEPlace to enter into a long-term <br />ground lease with a to-be-formed Tax Credit partnership. The Tax Credit partnership will <br />consist of WISEPlace, Jamboree and a Tax Credit Investor. However, per discussions <br />with Jamboree and WISEPlace, the Tax Credit partnership cannot assume any of <br />WISEPlace’s existing debt – including the existing CDBG Loan. Furthermore, given that <br />the Tax Credit partnership will be ground leasing the site from WISEPlace, there are no <br />available sales proceeds to pay off the existing CDBG Loan. As such, to effectuate the <br />proposed WISEPlace PSH project, WISEPlace is requesting forgiveness of the existing <br />CDBG Loan. <br />Staff recommends that the City Council approve WISEPlace’s CDBG Loan forgiveness <br />request. As discussed above, the amended promissory note already allowed for loan <br />forgiveness during the first 15 years of the loan term. The additional loan forgiveness <br />would be in line with past City actions regarding loans provided to WISEPlace. In addition, <br />the CDBG Loan is structured with interest only payments; therefore, none of the <br />outstanding principal balance is currently being paid down. This would leave an <br />outstanding balance of $723,446.41 plus interest to be repaid in full in Year 2056. <br />Additionally, as part of the proposed Project, the City will be placing new City loan(s) on <br />the Project. Thus, the City will still be entitled to receive residual receipts from the PSH <br />project. <br />ENVIRONMENTAL IMPACT <br />Pursuant to the Adaptive Reuse Ordinance (Ordinance No. NS-2874), the proposed <br />project is found and determined to be consistent with the General Plan of the City of Santa <br />Ana. Therefore, in accordance with the California Environmental Quality Act, the
The URL can be used to link to this page
Your browser does not support the video tag.