Laserfiche WebLink
CITY OF SANTA ANA <br />RFP NO.: 21-127 <br />SA-2 PRESSURE CONTROL STATION RELOCATION AND TRANSMISSION MAIN <br />IMPROVEMENTS <br />Task 4. Civil Operational Project Design Standard and Criteria <br />The Consultant shall work with City staff to determine the applicable design <br />standards and criteria in addition to those defined by the feasibility study. The <br />Consultant shall consider other possible agency design criteria and/or standards <br />as necessary. A maximum of eight (8) three (3) hour workshop sessions shall <br />be conducted with the Project Manager, City Operations staff and the <br />Consultant design team. The Consultant shall be responsible for organizing the <br />meeting including obtaining background information for discussion, preparing <br />the agenda, compiling meeting minutes and action items, as well as distributing <br />the minutes as required. Elements to be discussed shall include, but not be <br />limited to, operational parameters, ideal control conditions, and operator <br />experience. <br />Task 5. Basis of Design <br />Upon completion of Tasks 2 through 4 above, the Consultant shall prepare a <br />Basis of Design Report including elements and findings from all of the Tasks. <br />The Basis of Design Report shall summarize all of the alternatives and outline <br />the agreed upon alternative including reasons why the alternative was chosen. <br />The Basis of Design includes 30% drawings of the chosen alternative including <br />all proposed improvements. The Basis of Design Report shall be stamped and <br />signed by a California Registered Civil Engineer. Prior to completion of the final <br />Basis of Design Report, the Consultant shall prepare and submit for review a <br />draft Basis of Design Report to City staff. <br />The Basis of Design will include, but not be limited to, such issues as: <br />1. An overall evaluation of the existing SA-2 station based on current design <br />standards. Identify new SA-2 station improvements needed to improve <br />operations, reliability and safety. <br />2. Make recommendations for SA-2 improvements for the building or service <br />vault as well as related piping. Propose possible building architectural <br />features that can be incorporated into the local neighborhood <br />surroundings and provide concept drawings of the new building. <br />3. Provide 3D renderings of the proposed building or service vault with key <br />dimensions identified to City staff to assist in evaluations of the station's <br />operation, maintainability and reparability. <br />3. The City desires to store energy from the hydro -turbine as well as any solar <br />paneling and use it directly to power the Walnut Pump Station. Provide <br />alternative strategies to achieve this goal and the feasibility of using the <br />Page 4 of 11 <br />