My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 4:44:00 PM
Creation date
8/15/2023 1:44:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 21-127 <br />SA-2 PRESSURE CONTROL STATION RELOCATION AND TRANSMISSION MAIN <br />IMPROVEMENTS <br />electric generation in this manner. Provide locations for possible battery <br />storage units as well as size and footprint for said units. <br />4. Prepare preliminary electrical and control system design plans for hydro - <br />turbine generator and related appurtenances. The Consultant shall also <br />evaluate the existing standard operating procedures for the existing <br />pressure reducing station, make recommendations to modify how the <br />station operates at a control system level and SCADA level, and provide <br />preliminary control panel designs in accordance with the City's panel build <br />guidelines and the description below. This shall also include an electrical <br />operational plan and control scheme. <br />CONTROL SYSTEM DESIGN <br />The Consultant shall, be required to provide full control panel designs for <br />the hydrogenerator, control valve operations and site operations. Control <br />panel designs shall contain fully engineered diagrams that specify all <br />equipment, backpanels, terminal blocks, special components and related <br />items. Also included in the design shall be all control wiring diagrams, <br />specific 1/0, panel elevations, item and quantity lists with specific part <br />numbers. Control system design programmers allowed are as follows: <br />Enterprise Automation <br />210 Goddard <br />Irvine, CA 92618 <br />Scott Pickford — Owner <br />949-769-6000 <br />KDC Systems <br />4462 Corporate Center Drive <br />Los Alamitos, CA 90720 <br />Lukasz Niedojadlo — Project Manager <br />714-236-2209 <br />Industrial Control Systems Online <br />P.O. Box 381 <br />Ripon, CA 95366 <br />Steve Scrosati — CEO <br />209-599-9775 <br />ADDITIONAL RELATED DUTIES THAT MAY BE ASSIGNED: <br />A. The Consultant will be required to design and develop tagging <br />standards. Tagging should include information both on physical <br />devices, instruments, equipment, PI -Cs, control cabinets, as well as <br />tagging within the historian and data warehouse. <br />Page 5 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.