My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 4:44:00 PM
Creation date
8/15/2023 1:44:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 21-127 <br />SA-2 PRESSURE CONTROL STATION RELOCATION AND TRANSMISSION MAIN <br />IMPROVEMENTS <br />established. The intent of this site manual is to define standard operating <br />procedures for field operations. <br />Additional Work <br />The Consultant is encouraged in its proposal to identify any additional work that <br />is not specified in this Scope of Work that would be, in its opinion necessary or <br />of benefit to complete the Project as defined herein. If identified, this Additional <br />Work must be included and separated out in the Consultant's Proposal and Fee <br />Schedule. <br />Consultant Responsibilities: <br />The consultant shall be available to provide all the services stated and detailed <br />hereon. <br />City Responsibilities: <br />The City will provide information in its possession relevant to the preparation of <br />the required information in the RFP. The City will provide only the staff assistance <br />and the documentation specifically in referred to herein. <br />• Location Map <br />• Existing SA-2 As -Built Plans <br />• Water Main Records Drawings for existing piping for SA-2 <br />• Existing Panel Drawings and Control System Standards. <br />• Functional Specifications will be disclosed to the selected consultant. <br />• SA-2 Edison Demand <br />• Feasibility Study (SA-2) <br />Fee Proposal: <br />In addition to Section IV.B.3 (Submittal Requirements: Fee Proposal) fee schedule shall <br />be structured as follows: <br />Page 11 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.