My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 4:44:00 PM
Creation date
8/15/2023 1:44:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA-2 Pressure Control Station Relocation <br />and Transmission Main Improvements <br />RFP No. 21-127 <br />SA-2 and generator operational parameters, control conditions including battery storage; <br />Additional piping to connect to Walnut Reservoir and/or distribution system; <br />Preliminary electrical and control system design and operating procedures; <br />Power connection and communication alternatives with Walnut Pump Station; and <br />Site improvements including WQMP and any specific CEQA requirements. <br />Task a: Basis of Dezwyi, <br />Tetra Tech will prepare the Basis of Design report which will summarize all of the alternatives and <br />outline the agreed upon alternative including reasons why the alternative was chosen. The Basis of <br />Design will include 30% drawings of the chosen alternative including proposed site improvements. <br />The nine (9) key design decisions that we identified within our Approach Section (Key Design <br />Decisions) of our proposal will be addressed in addition to the ones noted in the City's RFP. <br />We have assumed that a similar mechanical layout to the SA-7 relocation project and the SA-1 hydro - <br />generator replacement layout will be the starting point for the mechanical layout for the SA-2 facility. <br />Tetra Tech will evaluate the three alternatives for the facility (wall enclosure, building and vault) at the <br />two potential sites (a minimum of six site exhibits). As part of the evaluation, Tetra Tech will <br />recommend any building or perimeter wall architectural features that will help blend in with the local <br />neighborhood surroundings. Noise will be a major factor in the ultimate selection of the alternative. <br />We have assumed for this proposal, that the approved alternative for the facility will be a below ground <br />service vault. Tetra Tech will provide 3D renderings of the service vault to assist the City in its <br />evaluation of the station's operation, maintainability and reparability. Tetra Tech can provide a 3D <br />rendering of OCWD's Injection Well vault structure as the starting point for the vault alternative <br />evaluation. <br />Tetra Tech will evaluate the best method of conveying and connecting the power generated by the <br />hydro -generator to the Walnut Pump Station Facility. In addition, Tetra Tech will recommend the <br />electrical improvements at the Walnut Pump Station Facility and at SA-2 Facility to best use the <br />generated power. Tetra Tech will provide alternative strategies to achieve this goal as well as the <br />feasibility of using the power generated in this manner. This will include possible battery storage units, <br />including size and footprint of said units. <br />With input and assistance from Enterprise Automation, a new Tetra Tech Company, Tetra Tech will <br />work with the City to prepare preliminary electrical and control system design plans and make <br />recommendations for communications between SA-2 and Walnut Pump Station including radio <br />network/ technology options as well as fiber connections. <br />Tetra Tech will perform any hydraulic modeling as required to confirm the benefit of various connection <br />locations to the City's distribution system. Tetra Tech is extremely knowledgeable of the City's water <br />model due to its previous work with ID Modeling (Sedaru) on updating the City's Water Model. <br />Tetra Tech is well aware of the issues working with MWD with regards to modifying any of MWD meter <br />connections (previous experience with the SA-5 Vault Upgrade Project). <br />Tetra Tech's subconsultant, Scott Foster Engineering, Inc., will assist with satisfying MWD's potential <br />request for a transient analysis of the new pressure control station. Scott Foster's scope of work will <br />include: information review; model development under two flow conditions; surge analysis of valve <br />closures, sudden loss of load (runaway) of the hydro -turbine or flow control valve; recommend surge <br />protection measures; and prepare a technical memorandum. <br />TETRA TECH Page 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.