My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 4:44:00 PM
Creation date
8/15/2023 1:44:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA-2 Pressure Control Station Relocation <br />and Transmission Main Improvements <br />RFP No. 21-127 <br />An administrative final IS/MND with the responses to comments, the MMRP, and any revisions to <br />the final IS/MND will be prepared and submitted to the City. <br />Tetra Tech will prepare the Notice of Determination (NOD) for the City to file with the County Clerk <br />and will file the NOD with the State Clearinghouse. <br />TasK u inrougn I asK 0: rJact l.onstruction uocumeni: <br />Tetra Tech will prepare 60%, 90% and Final Construction Document (PS&E) submittals as specified <br />within the RFP. The plans will be prepared in accordance with the City's Design Guidelines for Water <br />Facilities. Tetra Tech will compile in a matrix format all comments received and responses made for <br />each document submittal. This spreadsheet will be submitted to all reviewers prior to and as part of <br />each submittal. <br />Tetra Tech will prepare a waiver request letter to the Division of Drinking Water (DDW) for all water <br />main alignments or crossings which do not meet DDW's latest separation requirements. <br />We anticipate the construction drawings will include the following: <br />1 <br />Title Sheet with Vicinity and Project Location Maps and General Notes <br />2 <br />Notes for Project, Standard Water Notes, MWD Requirements and Sheet Index <br />3 <br />Public Works/Building/Fire Notes, and Traffic Concepts <br />4 <br />Abbreviations, Standard Symbols, Utility/Agency Index; Bench Mark, etc. <br />5 <br />Construction Notes <br />Horizontal Control Plan <br />Existing SA-2 Demolition Plan and Details <br />6 <br />7 <br />8 <br />Existing SA-2 Demolition Sections and Details <br />9 <br />Construction Phasing and Staging Requirements for Adjacent City Property <br />10 <br />SA-2 Shoring, Noise Control and Monitoring Plan <br />11 <br />SA-2 Site and Grading Plan <br />12 <br />SA-2 Site Details <br />13 SA-2 Yard Piping Plan <br />14 Perimeter Wall Plan, Profile and Details <br />15 Yard Piping Profiles and Connections <br />16 Site Details including Driveway, Gate and Site Improvements <br />17 <br />WQMP Plan, Sections and Details <br />18 - 21 <br />High -Pressure Pipeline Plan and Profile (4 sheets) <br />22 - 24 <br />Optional Additional Distribution Pipeline Plan and Profile (3 sheets) <br />25 <br />Walnut Bypass Plan, Profile and Details <br />26 <br />MWD Meter Vault and Walnut Bypass Connection Details <br />27 <br />Trench and Miscellaneous Details <br />Piping and Appurtenances Details <br />Connection Details to Distribution System and Abandonment Plan <br />28 <br />29 <br />30 <br />Pavement Replacement Plan and Street Restoration <br />31 <br />Walnut Pump Station Modifications and Restoration <br />TETRA TECH Page 113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.