My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 4:44:00 PM
Creation date
8/15/2023 1:44:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA-2 Pressure Control Station Relocation <br />and Transmission Main Improvements <br />RFP No. 21-127 <br />32 <br />SA-2 and Hydro -generator Mechanical Plan <br />33 <br />SA-2 and Hydro -generator Sections <br />34 <br />Mechanical Appurtenances and Hydro -generator Details <br />35 <br />Miscellaneous Piping and Support Details <br />Vault Ventilation Plan and Equipment Summary <br />Battery Storage Units Plan, Section and Details <br />General Structural Notes and Special Inspections/Structural Observations <br />36 <br />37 <br />38 <br />39 <br />Vault Foundation and Roof Deck Plans <br />40 - 41 <br />Vault Traverse and Longitudinal Sections (2 sheets) <br />42 <br />Vault Details <br />43 <br />Typical Structural Details <br />44 <br />Electrical Symbols and Abbreviations <br />45 <br />SA-2 Electrical Plan <br />SA-2 Instrumentation and Control Plan <br />SA-2 Lighting and Grounding Plan <br />46 <br />47 <br />48 <br />Single Line Diagram and Electrical Schedules <br />49 <br />SA-2 Gate Operator Plan <br />50 <br />Electrical Details <br />51 <br />Electrical Conduit to Walnut Pump Station Facility <br />52 <br />Walnut Pump Station Electrical Plan <br />53 <br />Hydro -Generator Control Logic and Details <br />54 Battery Storage Plan and Details <br />55 Battery Control Panel <br />56 Instrumentation and Control Symbols and Abbreviations <br />57 I&C P&ID <br />58 I&C Network Diagram and I/Os <br />59 SA-2 Control Panel Elevations and Details <br />60 Hydro -Generator Synchronization Control Panel and Details <br />Tetra Tech will provide the following Envision related services during the PS&E phase of the work: <br />Complete ISI Envision rating of the project. <br />Register the project with ISI and complete rating and submit for verification. City of Santa Ana will <br />need to pay the registration and verification fees, which are expected to be around $15,000 to <br />$20,000. <br />Compile documentation of the project and prepare credit narratives and cover sheets. <br />We have assumed that calculations will not be necessary and all required data will be included in <br />the Basis of Design report or final design calculations and CEQA documents. <br />Prepare specification that will direct the construction contractor of their requirements during <br />construction necessary to achieve Envision goal. <br />TETRA TECH Page 114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.