My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 4:44:00 PM
Creation date
8/15/2023 1:44:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA-2 Pressure Control Station Relocation <br />and Transmission Main Improvements <br />RFP No. 21-127 <br />City of Santa Ana Experience <br />Members of our project team have completed more than 40 water/wastewater projects for the City <br />since 1999. Our project team knows the City's design requirements and standards, preferred materials, <br />and operational preferences which will allow us to complete the design in the most cost-effective <br />manner. In addition, Enterprise Automation, one of the City's Control System Design Programmers, is <br />now a Tetra Tech company. We believe that our best reference is our past performance on projects <br />that we have completed for the City. We are confident that these past projects with the City will attest <br />to our technical excellence, responsive staff, and our complete understanding of the City's facilities. <br />The following is a brief list of relevant City projects we have been completed in the last 5 years. <br />Pipeline Projects: <br />Well 32 Rehabilitation: 3,600 feet of 12-inch well discharge piping within Westwood Avenue; <br />Memory Lane; and Bristol Street; <br />Ritchey Street Water Main Relocation: 1,800 feet of 8-inch and 16-inch water main within Ritchey <br />Street; <br />Water Main Improvements: 900 feet of 20-inch and 12-inch water mains within French Street; and <br />Spurgeon Street; <br />San Lorenzo Sewers: 1,400 feet of 10-inch force main and 15-inch gravity main within Segerstrom <br />Avenue and Bristol Street; and <br />Centennial Park Neighborhood Water Main Improvements: 20,000 feet of 8-inch mains. <br />Pressure Reducing Stations: <br />SA-1 Hydro -Generator Replacement; <br />SA-2 Relocation Feasibility Study; <br />SA-7 Pressure Reducing Station Relocation; <br />SA-5 Vault Modifications; and <br />SA-4 Vault Relocation. <br />Gnvicinn Pvnorionce <br />Our Project Team has completed the following projects that included Envision Certification: <br />Albion Riverside Park for City of Los Angeles: Regional stormwater BMP and park project along the <br />Los Angeles River; Envision Award Received: Gold. <br />Santa Monica Clean Beaches Initiative for City of Santa Monica: Regional stormwater BMP project <br />near Santa Monica Pier; Envision Award Received: Gold. <br />Taylor Yard Bikeway/Pedestrian Bridge for City of Los Angeles: Pedestrian Bridge over the Los <br />Angeles River: Envision Award Received: Gold. <br />Vista Canyon Regional Transit Center for City of Santa Clarita: Regional bus transit station: <br />Envision Award Received: Verified. <br />Aliso Creek — Limekiln Creek Restoration for City of Los Angeles: Regional stormwater BMP and <br />creek restoration project: Envision Award Pursued: Gold. <br />San Fernando Valley Stormwater Capture Projects for City of Los Angeles: Multiple regional <br />stormwater BMP projects: Envision Award Pursued: Gold. <br />TETRA TECH Page 117 <br />
The URL can be used to link to this page
Your browser does not support the video tag.