Laserfiche WebLink
SA-2 Pressure Control Station Relocation <br />and Transmission Main Improvements <br />RFP No. 21-127 <br />RELEVANT PROJECT EXPERIENCE <br />During the last 15 years, our Project Team has designed more than 200 miles of water, recycled water, <br />and sewer mains within fully developed areas having extensive traffic control and utility conflicts. <br />During that same time frame, our Project Team has designed more than 15 flow control or pressure <br />reducing facilities. The following table summarizes some of the relevant project experience that our <br />Project Team has completed during the last five (5) years: <br />Design Project Team <br />Complete Rnsible Staff <br />•m Epperson <br />Matt Vera <br />MOULTON NIGUEL <br />Crown Valley Pipeline Replacements: <br />Erin Cabanero <br />WATER DISTRICT <br />9,600 feet of 12-inch water main within <br />Erica Jenkins <br />Laguna Niguel <br />Crown Valley Parkway including <br />2022 <br />Jaden Miller <br />ID No. 1 Master Meter Relocation <br />Mazen Kassar <br />Matt Collings, PE <br />(10 cfs capacity) <br />Doug Seaman <br />949/425-3552 <br />Eric Yuen <br />Peter Kim <br />Paula Fell <br />MESA WATER <br />Chandler Croddy Wells Pipeline: <br />Tom Epperson <br />Erin Cabanero <br />DISTRICT <br />and <br />Santa Ana/Costa Mesa <br />Two Wells (Well Nos. 12 and 14) located <br />Erica Jenkins <br />within Santa Ana including 4,500 feet of <br />2021 <br />Mazen Kassar <br />Andrew Wiesner, PE <br />16"/30" water mains within Chandler Ave.; <br />Eric Yuen <br />Croddy Way; MacArthur Blvd. <br />Peter Kim <br />949/207-5458 <br />Paula Fell <br />ORANGE COUNTY <br />Tom Epperson <br />WATER DISTRICT <br />Mid -Basin Injection Wells: <br />Erin Cabanero <br />Fountain Valley <br />Four Injection Wells within Vault Structures <br />2017 <br />Mazen Kassar <br />10,500 feet of 36" to 12" pipelines within <br />Eric Yuen <br />Chris Olsen, PE <br />Edinger Ave. and Centennial Park <br />Nate Schreiner <br />714/378-3232 <br />Peter Kim <br />PRS-SCADA Upgrades <br />2022 <br />Tom Epperson <br />CITY OF ANAHEIM <br />Rehab and Upgrade PRS Nos. 1 — 6 <br />2017 <br />Erica Jenkins <br />Anaheim <br />Katella Water Main Replacement: <br />2017 <br />Jaden Miller <br />7,000 feet of 12" to 16" water mains within <br />Mazen Kassar <br />Jake Hester, PE <br />Katella Ave. from Haster Street to <br />Doug Seaman <br />714/765-4421 <br />Disneyland Drive <br />Eric Yuen <br />Peter Kim <br />EL TORO WATER <br />DISTRICT <br />Recycled Water Expansion — Phase 11: <br />Tom Epperson <br />Laguna Woods <br />20,600 feet of 4" to 10" recycled water <br />2018 Erin Cabanero <br />Erica Jenkins <br />Dennis Cafferty, PE <br />mains <br />Jaden Miller <br />949/837-7050, ext. 223 <br />CITY OF ORT BEACH <br />Newport Blvd Water Main Replacement:NEWP <br />Tom Epperson <br />Newport Beach <br />Newport Pier Area WM Replacement <br />Neha Gajjar <br />5,200 of 24" to 8" water mains within <br />2017 Erin Cabanero <br />Mike Sinacori, PE <br />Newport and Balboa Boulevards and <br />Peter Kim <br />949/644-3342 <br />5,800 feet of 6" mains in residential streets <br />TETRA TECH Page 116 <br />