Laserfiche WebLink
SA-2 Pressure Control Station Relocation <br />and Transmission Main Improvements <br />RFP No. 21-127 <br />Matt Vera, PE <br />PRs Facility <br />Mr. Vera has provided design engineering in various water and <br />wastewater projects including domestic and reclaimed water <br />pipelines, gravity sewer mains, sewer main rehabilitations, pump <br />stations, lift stations, wells, flow control facilities, and pressure <br />reducing valve vaults. Matt's responsibilities have included <br />preparation of construction plans, specifications, design <br />calculations, and assistance to supervisors in preparing project <br />reports, studies, and memorandums. <br />EXPERIENCE <br />IAI, 11 Kl„ '2'7 r:+., ^F 0^ • - Project Engineer. <br />The City of Santa Ana selected Tetra Tech for the design of the Well <br />No. 32 rehabilitation project. The project required a PDR, plans, and <br />specification development for the rehabilitation of the well facility. The <br />Education: <br />BS, Civil Engineering, <br />University of California, Irvine, <br />2013 <br />Registrations/Certifications: <br />Professional Civil Engineer, <br />California, No. 86663, 2016 <br />Professional Affiliations: <br />Orange County Water <br />Association <br />Office Location: <br />Irvine, CA <br />Total Years of Experience: <br />underground well would be scraped, cleaned and modified within an <br />above -ground CMU block control building (housing mechanical and electrical rooms). The design also <br />includes 3,500 feet of 12-inch discharge pipe to John Garthe Reservoir with a bridge crossing, <br />modification at the reservoir to connect to the on -site piping and a separate on -site generation sodium <br />hypochlorite building including restroom and shower facilities. <br />CA 1 Hvrlrn_(;Pr^-^+... o,...i ,,.,,..,,.�+ fit, of c,.,+, A—_ r Project Engineer. Engineering design <br />services for replacement of a 33-year old turbine generator. Services include removing the existing <br />turbine/generator and installing a new unit and connecting to the electrical and control systems, <br />upgrading the ventilation system, new RTU control panel, coordination with Enterprise Automation, and <br />replacement of the existing switchboard and MCC. The demolition of the existing unit will include the <br />removal of the generator, turbine shaft, impellers and upper housing. Replacement will include new <br />construction involving, new motorized valve upstream of the new turbine/generator, new manual valve <br />downstream, new ball valve with motorized flow controller, and new PRV valve (in series). <br />1 :sa ca.a:.. 4 ., a Mn11lfnn -.. InI--+-%r M—frir4 I nminn Mirmal rf Project <br />Engineer. Tetra Tech was selected to provide miscellaneous enhancements/rehabilitations to improve <br />the reliability of the District's Regional Lift Station. The project included installation of a 13,000 gallon <br />per minute independently -powered, self -priming, backup pumping system which will engage during loss <br />of power (whether scheduled or emergency) or routine pump maintenance, the downsizing one of five <br />existing sewage pumps with the installation a sewage grinder to better handle low flow conditions and <br />the addition of supplementary wet well capacity to mediate issues with the existing wet well overflow. <br />The project included rehabilitation to an existing wet well and a removable roof installation over the <br />existing valve vault to allow easier access for future maintenance. The construction sequencing is of <br />key importance as the lift station is required to remain on-line throughout enhancements. <br />J.B. Latham Wastewater Treatment Plant Miscellaneous Improvements - Digester 4 <br />Rehabilitation, South Orange County Wastewater Authority, Dana Point, CP Project Engineer. <br />Rehabilitate an existing 45-foot diameter digester, including modifications to their existing digester <br />control room for Digester 3 and Digester 4 at the J.B. Latham Wastewater Treatment Plant. The project <br />includes the repair and coating of the concrete digester walls, the removal/replacement of most existing <br />digester piping/appurtenances, and replacing existing gas mixing lances. <br />TETRA TECH <br />