Laserfiche WebLink
SA-2 Pressure Control Station Relocation <br />and Transmission Main Improvements <br />RFP No. 21-127 <br />Jaden Miller, EIT <br />')esign Fngineer <br />Mr. Miller has provided design engineering in various water <br />projects including water main replacements and disinfection <br />system facilties. Responsibilties have been utility research, field <br />checks, preparation of construction plans, and cost estimates. <br />EXPERIENCE <br />Indian Hill Boulevard Water Main Replacement, JA Salazar, <br />Comptc CA As Design Engineer completed the design plans for a <br />water main project in the City of Claremont and Los Angeles County. <br />The work was completed as part of a design -build contract with JA <br />Salazar. Work included: existing utility research and base map <br />t;id t b d t ' d I; t I t' <br />Education: <br />BS, Civil Engineering, <br />California State University, <br />Fullerton, 2018 <br />Registrations/Certifications: <br />Engineer -in -Training, <br />California, No. 170827, 2020 <br />Office Location: <br />Irvine, CA <br />Total Years of Experience: <br />Years with Tetra Tech: <br />prepara on, a ermining a an onmen require , a ignmen se ec ion <br />and field check surveys, interaction with GSWC project manager with plan check comments, <br />procurement of permit. Total water main footage was approximately 4,500 feet of 8-inch and 12-inch <br />pipe. <br />As Design Engineer <br />completed the design plans for a water main project in the City of Compton and Los Angeles County. <br />The work was completed as part of a design -build contract with Precision Pipeline. Work included: <br />existing utility research and base map preparation, determining abandonment required, alignment <br />selection and field check surveys, interaction with GSWC project manager with plan check comments, <br />procurement of permit. Total water main footage was approximately 20,000 feet of 8-inch pipe. <br />AtKinson Area Main Keplacement, Precision Pipeline, Hawthorn, liewooa, c, As Design <br />Engineer completed the design plans for a water main project in the City of Hawthorne and Inglewood. <br />The work was completed as part of a design -build contract with Precision Pipeline. Work included: <br />existing utility research and base map preparation, determining abandonment required, alignment <br />selection and field check surveys, interaction with GSWC project manager with plan check comments, <br />procurement of permit. Total water main footage was approximately 17,000 feet of 8-inch pipe. <br />Lennox Boulevard Area Water Main Replacement, Golden State Water Company, CA As Design <br />Engineer completed the design plans for water main projects in the Southwest District in the City of <br />Lennox. Work included: existing utility research and base map preparation, determining abandonment <br />required, alignment selection and field check surveys, interaction with GSWC project manager with plan <br />check comments, obtained approval of fire hydrant locations from Los Angeles County Fire <br />Department, and prepared letter and exhibits for Department of Public Health approval. Total water <br />main footage was approximately 13,000 feet of 8-inch pipe. <br />Fern Avenue Area Water Main Replacement, Golden State Water Company, Cf As Design <br />Engineer completed the design plans for water main projects in the Orange West System in the City of <br />Stanton and Garden Grove. Work included: existing utility research and base map preparation, <br />determining abandonment required, alignment selection and field check surveys, interaction with <br />GSWC project manager with plan check comments, obtained approval of fire hydrant locations from <br />Orange County Fire Department, and prepared letter and exhibits for Department of Public Health <br />approval. Total water main footage was approximately 4,100 feet of 8-inch pipe. <br />Live Oak and Lynrose Water Main Replacement, Golden State Water Company, CA. As Design <br />Engineer completed the design plans for water main projects in the Southwest District of Arcadia. Work <br />included: existing utility research and base map preparation, determining abandonment required, <br />alignment selection and field check surveys, interaction with GSWC project manager with plan check. <br />Total water main footage was approximately 7,500 feet of 8-inch pipe and 12-inch pipe. <br />TETRA TECH <br />