SA-2 Pressure Control Station Relocation
<br />and Transmission Main Improvements
<br />RFP No. 21-127
<br />Jaden Miller, EIT
<br />')esign Fngineer
<br />Mr. Miller has provided design engineering in various water
<br />projects including water main replacements and disinfection
<br />system facilties. Responsibilties have been utility research, field
<br />checks, preparation of construction plans, and cost estimates.
<br />EXPERIENCE
<br />Indian Hill Boulevard Water Main Replacement, JA Salazar,
<br />Comptc CA As Design Engineer completed the design plans for a
<br />water main project in the City of Claremont and Los Angeles County.
<br />The work was completed as part of a design -build contract with JA
<br />Salazar. Work included: existing utility research and base map
<br />t;id t b d t ' d I; t I t'
<br />Education:
<br />BS, Civil Engineering,
<br />California State University,
<br />Fullerton, 2018
<br />Registrations/Certifications:
<br />Engineer -in -Training,
<br />California, No. 170827, 2020
<br />Office Location:
<br />Irvine, CA
<br />Total Years of Experience:
<br />Years with Tetra Tech:
<br />prepara on, a ermining a an onmen require , a ignmen se ec ion
<br />and field check surveys, interaction with GSWC project manager with plan check comments,
<br />procurement of permit. Total water main footage was approximately 4,500 feet of 8-inch and 12-inch
<br />pipe.
<br />As Design Engineer
<br />completed the design plans for a water main project in the City of Compton and Los Angeles County.
<br />The work was completed as part of a design -build contract with Precision Pipeline. Work included:
<br />existing utility research and base map preparation, determining abandonment required, alignment
<br />selection and field check surveys, interaction with GSWC project manager with plan check comments,
<br />procurement of permit. Total water main footage was approximately 20,000 feet of 8-inch pipe.
<br />AtKinson Area Main Keplacement, Precision Pipeline, Hawthorn, liewooa, c, As Design
<br />Engineer completed the design plans for a water main project in the City of Hawthorne and Inglewood.
<br />The work was completed as part of a design -build contract with Precision Pipeline. Work included:
<br />existing utility research and base map preparation, determining abandonment required, alignment
<br />selection and field check surveys, interaction with GSWC project manager with plan check comments,
<br />procurement of permit. Total water main footage was approximately 17,000 feet of 8-inch pipe.
<br />Lennox Boulevard Area Water Main Replacement, Golden State Water Company, CA As Design
<br />Engineer completed the design plans for water main projects in the Southwest District in the City of
<br />Lennox. Work included: existing utility research and base map preparation, determining abandonment
<br />required, alignment selection and field check surveys, interaction with GSWC project manager with plan
<br />check comments, obtained approval of fire hydrant locations from Los Angeles County Fire
<br />Department, and prepared letter and exhibits for Department of Public Health approval. Total water
<br />main footage was approximately 13,000 feet of 8-inch pipe.
<br />Fern Avenue Area Water Main Replacement, Golden State Water Company, Cf As Design
<br />Engineer completed the design plans for water main projects in the Orange West System in the City of
<br />Stanton and Garden Grove. Work included: existing utility research and base map preparation,
<br />determining abandonment required, alignment selection and field check surveys, interaction with
<br />GSWC project manager with plan check comments, obtained approval of fire hydrant locations from
<br />Orange County Fire Department, and prepared letter and exhibits for Department of Public Health
<br />approval. Total water main footage was approximately 4,100 feet of 8-inch pipe.
<br />Live Oak and Lynrose Water Main Replacement, Golden State Water Company, CA. As Design
<br />Engineer completed the design plans for water main projects in the Southwest District of Arcadia. Work
<br />included: existing utility research and base map preparation, determining abandonment required,
<br />alignment selection and field check surveys, interaction with GSWC project manager with plan check.
<br />Total water main footage was approximately 7,500 feet of 8-inch pipe and 12-inch pipe.
<br />TETRA TECH
<br />
|