My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Comprehensive Facilities Condition Assessment for Various City Buildings
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Item 21 - Comprehensive Facilities Condition Assessment for Various City Buildings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 9:06:16 AM
Creation date
8/16/2023 8:19:11 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADA SURVEY: As part of the field inspection, AEI will incorporate elements as outlined in the City <br />of Santa Ana's transition plan including budgetary requirements as provided. <br />ELECTRONIC DATA COLLECTION: AEI's team of professionals his been utilizing tablet PC and iPads <br />to collect information from the field. AEI will utilize Kykloud software application to develop the <br />FCAs as well as tablet data collection devices to collect date from the field. This system also allows <br />AEI to geo-code and tag assets and take photographs of same within a 15 to 30 foot radius. <br />Interior systems and components may not be captured due based on the ability to triangulate <br />with cell phone systems. <br />QR BAR CODING: AEI will place bar codes on all major mechanical, electrical, and plumbing <br />equipment and incorporate same into the global FCA database. <br />Data Analysis & Report Format: AEI typically prepares one summary letter report for each <br />building/facility with cost estimates and future capital reserve expenditures. These reports have <br />typically included the following information: <br />General description of the building/facility in accordance with ASTM E2018-15. <br />Summary discussion of major costs and significant identified Immediate issues. <br />A Facility Condition Needs Index (aka Life Cycle Cost Analysis) of the facilities and associated <br />components. <br />A Capital Planning Replacement Reserve for 10 years <br />MS Excel Report Cost Data sheet with details of component information including quantity, <br />size, and cost indices (inflation factor) <br />Photos of Assets and deficiencies and identifying same with GIS coordinates. <br />Upon issuance, the City of Santa Ana will have 30 business days to provide commentary and <br />feedback for AEI to incorporate in the DRAFT Letter Report. A Final Letter Report and MS Excel <br />Tables will be delivered at that time. <br />Database & Computerized Maintenance Management System (CMMS) Integration: <br />AEI partners with Four Winds Group to provide CMMS capability with work ordering ticketing. <br />These systems have been designed to seamlessly integrate with AEI's data sets. Four Winds <br />Group provides Maintenance Productivity Enhancement Tool (M-PET) as part of this submission <br />package. Of note, the CMMS software will be hosted on the City of Santa Ana's servers. <br />Data Migration & Integration: AEI will upload all FCA data (narrative reports, photos, bar <br />coding, cost database, etc. into the City's Computerized Maintenance Management System <br />(CMMS). <br />Training: Four Winds Group Training will take place with your data and the basic necessities <br />of using the M-PET.NET application will be shown and put in place. Training for 3 levels of <br />maintenance will be completed (Management, Admin, Technician), . Some primary custom <br />reports required will be built and ready to access thru the M-PET.NET application. Additional <br />custom reports may be created at Customers request. This is a two person, three days on site <br />event. <br />PowerPoint Presentation: After the completion of the project, AEI will provide PowerPoint <br />presentations of our findings to the City well as elected officials and the public. <br />
The URL can be used to link to this page
Your browser does not support the video tag.