My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Comprehensive Facilities Condition Assessment for Various City Buildings
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Item 21 - Comprehensive Facilities Condition Assessment for Various City Buildings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 9:06:16 AM
Creation date
8/16/2023 8:19:11 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C - FIRM & TEAM EXPERIENCE <br />Northrup Grumman Marine Systems, Sunnyvale, CA <br />Client: <br />Northrup Grumman Marine Systems <br />Steve Winters — Manager — Facilities, Maintenance & Real Estate <br />(408) 735-2613 steve.winters@ngc.com <br />Project <br />AEI is in the process of completing a Facility Condition Assessment on this 70-acre <br />Discussion: <br />industrial complex in Northern, California. This property was first developed as an <br />Iron Works in the early 201" century and played a significant role in defense <br />production during World War II. AEI's FCA includes all 50 major buildings and <br />1,312,835 GSF of space as well as site improvements. In addition to the FCA, AEI <br />is also completing a detailed California scope Accessibility Survey and we've also <br />completing Seismic Risk Assessments with design recommendations on select <br />historic buildings. <br />Presentation: <br />AEI utilized the Kykloud FCA data -gathering software as well as tablet data collection <br />devices in developing detailed reports. A Narrative report was completed, along with <br />a database and spreadsheet of all deficiencies which included projected maintenance <br />activities. Key information included in the reports is each building's Facility <br />Condition Index (FCI), Expected and Remaining Useful Lives (EULs & RULs) of <br />e ui ment and building systems, and a 10 years capital expenditure budget. <br />Date: <br />October 2020 with an estimated completion date of June 2021 <br />k 'Y� <br />JOY <br />_; AEI Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.