My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Comprehensive Facilities Condition Assessment for Various City Buildings
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Item 21 - Comprehensive Facilities Condition Assessment for Various City Buildings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 9:06:16 AM
Creation date
8/16/2023 8:19:11 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C - FIRM & TEAM EXPERIENCE <br />Rocky Mountain Regional Medical Center — US Dept. of Veterans Affairs <br />Client: <br />DavEnergy Solutions & US Department of Veteran's Affairs <br />Contact: <br />Jason Ha e: 'ason.ha a davener .com — 912 667-7847 <br />Portfolio <br />AEI prepared a detailed Facility Condition Assessment on the VA Medical Center <br />Discussion: <br />campus in Aurora, Colorado. This new facility includes approximately 1.2 million <br />square feet of space set on a 31-acre campus. The property is improved with 10 <br />major campus/clinical buildings as well as a concourse connecting all <br />improvements. A mechanical pant and two parking garages also exist on the <br />campus and are included in the assessment. AEIs scope of work includes a <br />complete inventory of all building systems as well as confirming the presence of <br />various MEP equipment which was identified on design drawings. AEI's FCA <br />survey also includes identifying discrepancies between construction drawings and <br />as -built drawings. AEI's field inspection services are being utilized to amend the <br />"as -built" drawings to reflect "true" conditions. <br />Presentation: <br />AEI utilized the Kykloud FCA data -gathering software as well as tablet data <br />collection devices in developing detailed reports. Narrative reports will be <br />completed, along with a database and spreadsheet of all deficiencies which <br />included projected maintenance activities. Geocoded photos of deficiencies <br />overlaid on maps and site plans will be provided and integrated into the FCA <br />reports and database to be provided to the client. <br />Date: <br />Completed August 2019 <br />fir■till, <br />�`�«�,l.��J�o3ia19lurueriuu. ,� _ <br />NO <br />r <br />WTORF S}iT QF 11F <br />VA M161C111 CETI <br />f <br />f4 "� AEI Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.