Laserfiche WebLink
8. Scaffolding <br />1. All scaffolding shall utilize guardrails, mid rails, and toe boards. <br />2. No person shall be permitted to remain on scaffolding while it is being moved <br />or rolled. <br />3. Lock scaffold wheels when scaffold location is achieved. <br />4. Use Yz" mesh or equivalent if persons are to pass under scaffold. <br />5. Scaffold height shall not exceed four (4) times the base dimension. <br />6. Use only scaffold -grade lumber for planking. <br />2621 Honolulu Ave. Montrose, GA. 91020 Lic. No. 603409 DOSH No. 771 <br />818-249-4932 FAX 818.2494937 <br />