My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Agreements for On -Call Demolition Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Item 22 - Agreements for On -Call Demolition Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 9:10:22 AM
Creation date
8/16/2023 8:20:02 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
22
Date
5/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERIOR DEMOLITION, INC. City of Santa Ana <br />ASBESTOS ABATEMENT PLAN JOB *01 W 11th St <br />Santa Ana, CA 92703 <br />7. Use scaffolds capable of supporting at least four times the intended load. <br />8. Climbing of any scaffold braces or supports not specifically designed for access <br />is prohibited. <br />G Electrical <br />1. De -energize all circuits to the asbestos control area at the circuit breaker <br />panels. All electrical circuits in the asbestos control area shall be locked out at <br />the circuit breaker panel with padlocks. The padlock keys shall be provided to <br />the on -site Supervisor and Qualified Person (QP) only. <br />2. Electrical circuit breaker panels that are locked out shall be tagged with <br />appropriate labels designating that the panel is to remain locked. Label shall <br />also indicate whom to contact to gain access to the panel in case of <br />emergency. <br />3. Circuits in the asbestos control area shall be tested to determine of they have <br />been de -energized. <br />4. All electrical power for electrical equipment, portable hand tools, and extension <br />cords shall be provided through GFCls. <br />5. Use only shatterproof, guarded bulbs and heavy-duty wiring for temporary <br />lighting. <br />6. All electrical system lines and cords must not be allowed to lie in water. <br />D. Personal Protective Equipment <br />All personnel required to enter the asbestos control area must use all of the <br />protective devised indicated herein. <br />a. Respirators <br />Hatf-face Negatively Pressured -Air -Purifying Respirators (NPAPR) with <br />HEPA filter shall be adequate when removal of non -friable asbestos <br />containing materials is being conducted. Powered Air -Purifying <br />Respirators (PAPR) with HEPA filters shall be used during the removal of <br />friable asbestos containing materials. <br />Protective Clothing <br />Disposable suits with attached hood and boot covers designed for <br />asbestos abatement, rubber gloves, and rubber boots shall be worn by all <br />personnel entering the asbestos control area. Gloves are to be taped to <br />the suit sleeves with duct tape. <br />2. Regular demolition <br />a. Class D Personal Protective Equipment <br />Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.