Laserfiche WebLink
• Skidsteer with <br />grappler bucket <br />• End -dump or super- <br />10 truck (depending <br />on exact access <br />based on permit & <br />plan developed after <br />award) <br />• 40-yard dumpster <br />• 50,000-LB excavator <br />RFQ For On -Call Demolition Service <br />1 Superintendent <br />• 2 Operators <br />• 4 Laborers <br />• Subcontractor's <br />abatement crew <br />(foreman and 4 <br />laborers) <br />• Sledgehammers <br />• Hammers <br />• Jack hammers <br />• Pry bar <br />• reciprocating saw <br />• Air compressor <br />• Chain saws <br />• Weed eaters <br />• Saws (various <br />types/sizes) <br />• Shovels (various <br />types/sizes) <br />MACRO-Z-TECHNOLOGY <br />• Standard PPE (eye <br />protection, gloves, <br />vests, etc.) <br />• Abatement PPE for <br />the abatement crew <br />(Tyvek suits, <br />respirators) <br />• Poly sheeting <br />• Traffic control devices <br />(cones, stanchions, <br />delineators, arrow <br />boards, etc.) <br />• Walk -off matts <br />• SWPPP/ BMP <br />materials <br />Table 2. Equipment, crew, tools, and materials / supplies anticipated for the sample project <br />2.3 Phase 3: Perform the Work <br />2.3.1 Task 3.1: Abatement <br />• Prior to starting work, we'll provide required notice to the US EPA and CARB <br />We'll start with removing the bees so that the site is safe for abatement workers. We'll call a local bee <br />keeper to safely remove the hive without damaging the bee population. <br />• A qualified pest control subcontractor will abate vermin, using methods appropriate to the species and <br />locations encountered <br />• Erect asbestos and lead abatement containment (poly sheeting securely duct taped in place with <br />entrance vestibule and negative air pressure maintained inside) <br />• Qualified subcontractor abates the Asbestos Containing Materials (ACM), securely containing ACM <br />inside poly and transporting off -site <br />Deliverables for Task 3.1 <br />Abatement contractor's license <br />• Map and documentation specifying the ACM abated <br />• Hazardous materials transport / disposal manifests <br />• Completion letter indicating that the property has been abated & is ready for demolition <br />2.3.2 Task 3.2: Salvage & Demolish Exterior Site Features <br />• To save time, we perform site salvage & demolition concurrent with interior abatement <br />• Pothole and cap utilities based on coordination efforts during the pre -demolition preparation phase <br />• Salvage opportunities would be evaluated based on the project <br />• Using heavy equipment and hand tools, remove landscaping and trees and mulch if possible, covered <br />patio, and exterior paving <br />• Haul -off operations conducted as needed to maintain site cleanliness <br />2.3.3 Task 3.3: Salvage & Demolish Building Interior <br />• Salvage opportunities would be evaluated based on the project <br />• Using hand tools, demolish building interior features, including non -load -bearing walls, cabinets, <br />fixtures, drywall, HVAC, electrical, and plumbing. <br />2.3.4 Task 3.4: Salvage & Demolish Building Exterior <br />• Safely demolish and remove building structural walls. <br />o Either by deconstruction where we carefully remove structural elements from the top down, or <br />by using heavy equipment to push structural members toward the center of the property. <br />