My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Construction Contract Award for MacArthur Boulevard Resurfacing
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/19/2022 Regular
>
Item 17 - Construction Contract Award for MacArthur Boulevard Resurfacing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 10:22:46 AM
Creation date
8/16/2023 8:52:56 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
4/19/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Agency <br />www.santa-ana.org/pw <br />Item # 17 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br />Staff Report <br />April 19, 2022 <br />TOPIC: Construction Contract Award for MacArthur Boulevard Resurfacing <br />AGENDA TITLE <br />Award a Construction Contract to All American Asphalt in the Amount of $823,333 for the <br />MacArthur Boulevard Resurfacing Project from Flower Street to Main Street, Fiscal Year <br />(FY) 2021-22, with an Estimated Project Delivery Cost of $1,127,000 (Project No. 20- <br />6957) (Non -General Fund) <br />RECOMMENDED ACTION <br />1. Authorize budget reallocation of $126,576 in unspent HUTA 2103 Gas Tax funds to <br />the MacArthur Boulevard Resurfacing Project from Flower Street to Main Street (No. <br />20-6957) from the Gas Tax Local Street Improvements Project (No. 20-6956). <br />2. Award a construction contract to All American Asphalt, the lowest responsible bidder, <br />in accordance with the base bid in the amount of $823,333, for construction of the <br />MacArthur Boulevard Resurfacing Project from Flower Street to Main Street FY 2021- <br />22. <br />3. Approve the Project Cost Analysis for a total estimated construction delivery cost of <br />$1,127,000, which includes $823,333 for the construction contract, $113,334 for <br />contract administration, inspection and testing, and a $190,333 project contingency <br />for unanticipated, unforeseen work, and additional nearby asphalt pavement <br />improvements. <br />DISCUSSION <br />The City's Pavement Management Program (PMP) has been developed to prioritize and <br />recommend the most cost-effective roadway repairs, and maximize the return from <br />available funding for street pavement. The segment of MacArthur Boulevard, from Flower <br />Street to Main Street (Exhibit 1), is identified as a high priority for pavement rehabilitation <br />in the PMP. <br />This work includes reconstruction/resurfacing of existing pavement and replacement/ <br />installation of missing and damaged curbs, gutters, sidewalks, and curb ramps within this <br />street segment. The proposed contract has favorable bid pricing for asphalt pavement <br />
The URL can be used to link to this page
Your browser does not support the video tag.