Laserfiche WebLink
EXHIBIT A Page A1-12 <br /> <br /> <br /> EXHIBIT A SCOPE OF WORK <br /> <br />Task 5 Bid Advertisement, Construction Administration, Record Drawings: <br /> Bid and Award 4 months <br /> Construction Administration 12 months <br /> Record Drawings 2 months <br /> FFE Design intent and bid package – concurrent with Task 5 <br /> Signage Design Intent and bid package – concurrent with Task 5 <br /> <br /> <br />1.B The schedule for the project overall or any phase(s) may be adjusted upon mutual agreement of the <br />City and the Consultant to meet changing project needs. <br /> <br />