Reason for Change Comments <br />*At time conceptual bid was provided, the budget <br />was an educated guess as plans were not yet <br />generated. <br />792,240$ 773,386$ -$ 843,386$ 70,000$ Unforeseen Circumstance and Change of Scope <br />- Increase in sewer line size from 4 inches to 6. The original "as-built" plans from Gensler showed the existing condition as 6 inches. <br />- Additional plumbing for the pump in the back yard. <br />- Public Works required replacement of Fire and Domestic water in the street. <br />- Increase in material cost <br />- Overtime <br />1,089,046$ 1,032,170$ -$ 1,074,170$ 42,000$ Unforeseen Circumstance and Change of Scope <br />- Emergency lighting changes <br />- Additional bug-eye <br />- Redo lounge room 105 electrical per City's request <br />- Additional underground conduits that were not expected <br />- Rework dorm lighting <br />- Overtime <br />-$ 34,665$ -$ 34,665$ -$ Unforeseen Circumstance and Change of Scope - Switchgear needed to be expedited per the City's request <br />880,000$ 946,191$ 18,589.79$ 974,469$ 9,688$ Change of Scope and increase in material cost <br />- Framed upstairs which was not part of the original scope-Framing Square footage increased substantially due to framing of the <br />mezzanine. <br />- Original assumptions had us using ICF, however we needed to use wood framing which increased material cost by 25% <br />- Lumber prices have greatly increased in the past year <br />- Fire treated wood had to be used at the front that we were not anticipating to have to use. Never had to use on any other project. <br />- Overtime <br />110,948$ 89,629$ 1,730.80$ 112,860$ 21,500$ Change of Scope <br />- Increase in cabinetry scope (after 1st round of plans were produced) <br />- Front entrance area reception doors needed to be changed from original plan <br />785,000$ 607,590$ 89,019.00$ 785,000$ 88,391$ Change of Scope and increase in material cost - Increase in material cost and change in scope (after 1st set of plans were produced) <br />-$ -$ -$ 8,682$ 8,682$ Change of Scope - Needed to re-engineer the ducting runs <br />-$ -$ -$ 5,000$ 5,000$ Change of Scope - Needed to expedite per the City's request <br />-$ -$ -$ 23,500$ 23,500$ Change of Scope - Not part of original scope <br />204,000$ 4,967$ 183,874.45$ 208,968$ 20,126$ Change of Scope <br />- Required to protect the unused upstairs area, which was not part of 1st set of plans <br />- Upgraded to a voice activated system <br />245,700$ 151,070$ -$ 259,070$ 108,000$ Unforeseen Circumstance and Change of Scope - Increase in sprinkler heads because of conflict with lighting system and bathroom plumbing-Fire safety requirement <br />225,000$ 213,574$ 25,564.50$ 264,138$ 25,000$ Unforeseen Circumstance and Change of Scope <br />- Upsizing of fire water line <br />- Public works required replacement of Fire and Domestic Water main in the street. <br />181,967$ 200,677$ -$ 200,677$ -$ <br />475,000$ 600,905$ 60,651.79$ 783,435$ 121,878$ Change of Scope and increase in material cost <br />- Underestimated overall cost of work needed to be done <br />- Rains caused sub to need to recondition the soil <br />- Rebar cost significantly increased <br />-$ 6,000$ -$ 6,000$ -$ <br />-$ 18,000$ -$ 18,000$ -$ <br />125,000$ -$ -$ 140,000$ 140,000$ Change of Scope and increase in material cost - Patch work requested by Public Works <br />139,500$ 48,825$ -$ 143,825$ 95,000$ <br />206,700$ 206,700$ -$ 218,700$ 12,000$ Increase in Labor Cost - Potential change order for prevailing wage <br />432,275$ 429,212$ -$ 429,212$ -$ <br />22,000$ 23,987$ -$ 23,987$ -$ <br />36,000$ 46,448$ 1,923.75$ 57,371$ 9,000$ Change of Scope <br />- Engineering needed for roof work <br />- Cut in for rear exit door <br />- Roof screening engineering <br />325,000$ 337,267$ 13,663.77$ 375,931$ 25,000$ Change of Scope - Excavation for additional concrete work <br />37,723$ 29,017.80$ 2,901.78$ 37,723$ 5,804$ Extended Timeline - Timeline for project extended <br />12,000$ 15,506.70$ -$ 27,905$ 12,398$ Unforeseen Circumstance - Assumed Turelk's original contract after taking over which included an unknown dismantle charge of $12,398 <br />17,843$ 16,745.92$ 1,547.18$ 21,387$ 3,094$ Extended Timeline - Timeline for project extended <br />439,391$ 439,391.40$ -$ 439,891$ 500$ Change of Scope - Permit fee for shade structure <br />38,660$ 39,546.00$ -$ 39,546$ -$ <br />900,000$ 1,143,308.63$ 191,414.59$ 1,528,104$ 193,381$ Change of Scope and increase in material cost <br />- Because we were not allowed to use ICF construction method, scope of the drywall/insulation project was increased by 25%. - Framed <br />upstairs which was an increase in scope-Framing Square footage increased substantially due to framing of the mezzanine. <br />- Third layer of drywall was required by building and safety in all of the corridors causing a large increase in material and labor <br />-$ 10,000.00$ -$ 40,451$ 30,451$ Change of Scope - Changed from melamine to FRP <br />-$ 13,356.45$ -$ 13,356$ -$ Change of Scope - Changed from melamine to FRP <br />-$ 9,962.12$ 8,967.26$ 33,636$ 14,707$ Change of Scope <br />-$ -$ 92,316$ 92,316$ Change of Scope <br />150,000$ 154,603$ 1,573.79$ 156,177$ -$ <br />-$ -$ -$ 20,000$ 20,000$ Change of Scope <br />Switchgear <br />Fireproofing <br />Shaft Wall Framing/Drywall/Wallboard <br />Second Floor Tile <br />Captiveaire Equipment <br />Light Post <br />Shade Sales - Concrete <br />Sleeping Cubbies/FRP <br />Bathroom/FRP <br />Current <br />Outstanding <br />Invoices (not <br />drawn on) <br />Remaining Funds <br />Needed <br />HVAC Engineering <br />HVAC Freight for RUUD Equipment <br />Revised Budget as <br />of 3/22/22 <br />Civil Engineer <br />Structural Engineer <br />Demo/Excavation/Shoring <br />Consulting <br />Shoring Tower Rentals <br />Equipment Rental <br />Permit/Fees <br />Security Services (up to June 15th) <br />Tile <br />Rough Plumbing <br />Electrical <br />Rough Framing <br />Finished Carpentry <br />Project Number: CAR-1 <br />Dyer 18, LLC - 1815 Carnegie <br />Schedule of Values*January 2022 <br />Budget <br />Drawn as of <br />3/22/22 <br />Paving <br />HVAC <br />Fire Alarm System <br />Underground Utilities <br />Fire Sprinklers <br />Edison <br />Concrete Work (Interior & Exterior) <br />Drywall/Insulation <br />Roofing <br />Elevator <br />Architect <br />EXHIBIT 2