297,000$ 280,579$ 41,341.91$ 390,121$ 68,200$ Change of Scope <br /> The following doors were added to the scope: <br /> - Wood doors (City decision to upgrade material) <br /> - 2 hour glass door <br /> - Dining room accordion door <br /> - Rollout door <br /> - Glass bifold door <br /> - City requested to order more doors due to previous order being late <br />49,000$ -$ 6,960.53$ 6,961$ -$ Change of Scope <br />160,000$ 199,202$ -$ 199,202$ -$ Change of Scope and increase in material cost - Significant increase in material cost <br />-$ 20,000$ 15,021.24$ 65,021$ 30,000$ Change of Scope - Preferred method of ICF was rejected by building and safety <br />100,000$ 40,333$ 10,618.81$ 120,952$ 70,000$ Increase in material cost - Steel prices have increased dramatically over the life of the project <br />-$ 10,000$ -$ 10,000$ -$ <br />300,000$ 65,467$ 126,191.09$ 215,258$ 23,600$ Change of Scope <br />-$ 60,004$ 45,710.48$ 105,714$ -$ <br />-$ -$ -$ 24,230$ 24,230$ Change of Scope - Looking for less expensive substitutes <br />-$ -$ -$ 77,389$ 77,389$ Change of Scope - Looking for less expensive substitutes <br />-$ -$ 73,074$ 73,074$ -$ Change of Scope <br />-$ -$ 21,555$ 21,555$ -$ Change of Scope <br />25,000$ 27,031$ -$ 27,031$ -$ <br />-$ -$ 11,470$ 13,470$ 2,000$ Change of Scope <br />Exterior Fencing -$ -$ -$ 4,000$ 4,000$ Change of Scope <br />-$ -$ -$ 13,000$ 13,000$ Change of Scope <br />-$ -$ -$ 4,000$ 4,000$ Change of Scope <br />-$ -$ -$ 600$ 600$ Change of Scope <br />-$ -$ -$ 4,500$ 4,500$ Change of Scope <br />-$ -$ -$ 5,000$ 5,000$ Change of Scope <br />-$ -$ -$ 5,000$ 5,000$ Change of Scope <br />75,000$ -$ -$ 64,286$ 64,286$ Change of Scope - Recently added to the scope as there was additional work to repair and complete work not completed by the former contractor <br />140,000$ 72,436.85$ 12,752.73$ 152,440$ 67,250$ Change of Scope - Not part of original scope (part of FF&E) <br />200,520$ 221,335.09$ -$ 228,335$ 7,000$ - Needed to substitute lights because of back order and new lights were more expensive <br />76,146$ -$ -$ 76,146$ 76,146$ Change of Scope - City permitting process required roof screening <br />100,000$ -$ 21,225.70$ 100,000$ 78,774$ Change of Scope <br />25,000$ -$ -$ -$ -$ Unforeseen Circumstance and Change of Scope <br />100,000$ -$ -$ 100,000$ 100,000$ - Per City, amount determined per discussions with City Staff. <br />COVID Testing -$ -$ 3,380.00$ 3,380$ -$ <br />Site Cleanup -$ -$ 8,000.00$ 28,000$ 20,000$ Unforeseen Circumstance - PWA mandating cleanup at the site <br />Rolling Gates and operators -$ -$ -$ 50,000$ 50,000$ Change of Scope - Planned to use existing gates, but deemed unusable <br />Rec Area Gates and Hardware -$ -$ -$ 25,000$ 25,000$ Change of Scope and increase in material cost <br />9,643,660$ 8,639,089$ 998,724$ 11,655,203$ 2,017,391$ <br />1,055,923$ 1,066,077$ -$ 1,055,923$ -$ Extended Timeline - Timeline for project finish date extended due to design and permitting delays; scope of work increased <br />269,077$ 258,923$ -$ 269,077$ -$ Extended Timeline - Timeline for project finish date extended due to design and permitting delays; scope of work increased <br />10,968,660$ 9,964,089$ 998,724$ 12,980,203$ 2,017,391$ <br />Backyard Turf <br />Irrigation <br />Sod Grass <br />Grind and Seal <br />Stucco for CMU Block Wall <br />Shade Sales <br />Interior Paint <br />Roof Framing Allowance <br />Column Replacement <br />Fold-Up Door <br />Lighting Package <br />Roof Screening <br />Exterior Painting <br />Miscellaneous <br />Doors/Windows <br />CMU Block Wall <br />Shade Structures <br />Interior Finishes (Floor/Wall) <br />Upstairs Carpeting <br />Upstairs Vinyl <br />Playground/Fencing <br />Epoxy Kitchen <br />Plant/Tree Allowance <br />Pea Gravel <br />Fiber Glass Bender Board <br />Subtotal <br />General Conditions <br />Overhead/Main Office <br />Total <br />Camera/Security System <br />Exterior Finishes/Landscaping <br />EXHIBIT 2