Laserfiche WebLink
<br />City of Santa Ana - 47 - 2022 Annual Action Plan <br /> <br />Description 1. Improve transportation safety by installing pedestrian hybrid <br />beacon on Main Street (at Walnut Street) and the installation <br />of rectangular rapid flashing beacons at key areas identified <br />as highest priority based on city analysis. <br />2. Residential street repair in Heninger Park neighborhoods. <br />Target Date 6/30/2023 <br />Estimate the number <br />and type of families <br />that will benefit from <br />the proposed activities <br />2,000 <br />Location Description Activities will occur in CDBG eligible areas as described in the <br />Description <br />Planned Activities See description <br />6 Project Name CDBG Sidewalk Improvements <br />Target Area n/a – The City does not use target areas for CPD funding <br />Goals Supported Public Facilities and Infrastructure <br />Needs Addressed Improve City public facilities and infrastructure <br />Funding $407,233 <br />Description Project involves replacement of existing damaged concrete <br />sidewalks in neighborhoods and will include the removal and <br />replacement of adjacent damaged concrete curbs, gutter and <br />driveways. Project will focus on areas with the highest concentration <br />of needed repairs, to help mitigate trip and fall hazards and reducing <br />potential of liability claims and assist in complying with regulations <br />set forth by the American with Disabilities Act. <br />After the sidewalk concrete repairs within the public right of way are <br />completed, the public will have enhanced pedestrian and multi- <br />modal mobility through the improved neighborhoods. For at least <br />50% of Santa Ana's low-income population, bicycle is the primary <br />mode of transportation. Therefore, properly maintaining the <br />residential sidewalks that currently have no other viable revenue <br />source, is a direct service <br />EXHIBIT 1