My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Stormwater Channel Fencing Upgrades Phase II Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/05/2022 Special and Regular & HA
>
Item 14 - Stormwater Channel Fencing Upgrades Phase II Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2024 9:33:02 AM
Creation date
8/16/2023 10:31:49 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
14
Date
4/5/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM NO. 2 <br />CITY OF SANTA ANA PROJECT NO. 22-1390 <br />PROPOSAL <br />PROJECT NO.: 22-1390 <br />STORMWATER CHANNEL FENCING UPGRADES PHASE 11 <br />TOTAL BASE BUD J$ L "i 3LI 8 <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />The quantity for this bid item is shown for bid comparison only. This- bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />f This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within 170 working days after the commencement date stated in the Notice to <br />Proceed. The first 80 working days of which is for construction, and the last 90 working days for <br />the vandalism -maintenance period. The contractor shall order any material specified in the <br />contract document requiring a long lead-time immediately after the Notice to Proceed. The <br />lead-time for the items is including in the total worldng days. <br />The liquidated d6mages amount, in lieu of the amount specified in Subsection 6-9 of the <br />Standard Specifications, shall be $1,300 per calendar day. <br />Name <br />Signat <br />Title <br />(If an i <br />all individual co-partners composing the firm. If a corporation, state legal name of corporation, <br />and names of President, Secretary, Treasurer and Manager, thereof.) <br />P-2 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.