My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Stormwater Channel Fencing Upgrades Phase II Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/05/2022 Special and Regular & HA
>
Item 14 - Stormwater Channel Fencing Upgrades Phase II Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2024 9:33:02 AM
Creation date
8/16/2023 10:31:49 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
14
Date
4/5/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ANALYSIS <br />CONSTRUCTION OF PROJECT NO. 22-1390: Stormwater Fencing Upgrades <br />Phase II <br />Construction Contract <br />$ <br />669,348.00 <br />Contract Administration, Inspection and Testing <br />$ <br />55,000.00 <br />Contingencies <br />$ <br />125,000.00 <br />Design Engineering <br />$ <br />100,652.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />950,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.