My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Stormwater Channel Fencing Upgrades Phase II Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/05/2022 Special and Regular & HA
>
Item 14 - Stormwater Channel Fencing Upgrades Phase II Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2024 9:33:02 AM
Creation date
8/16/2023 10:31:49 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
14
Date
4/5/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Channel Fencing Upgrades Phase II Project <br />April 5, 2022 <br />Page 3 <br />awarding the construction contract to Lightning Fence Company, Inc. in the amount of the <br />base bid totaling $669,348 (Exhibit 3). <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes design engineering, construction administration, inspection, <br />and testing, along with an allowance for contingencies to account for unexpected or <br />unforeseen conditions. Construction administration and inspection includes the following: <br />construction management; implementation of the City's Community Workforce <br />Agreement requirements; inspection of the Contractor's work to ensure contract <br />compliance, workmanship, and quality; and materials testing. As indicated in the Cost <br />Analysis (Exhibit 4) and as summarized in the table below, the estimated total delivery <br />cost of the project is $950,000. The project contingency is higher than normal to address <br />anticipated issues with fencing and trespassing at locations outside the original scope of <br />work. <br />Project Item <br />Total <br />Construction Contract <br />$669,348 <br />Construction Administration, Inspection, Testing <br />$55,000 <br />Contingencies <br />$125,000 <br />Design Engineering <br />$100,652 <br />TOTAL CONSTRUCTION DELIVERY COST <br />$950,000 <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the recommended actions <br />are exempt from further review. Categorical Exemption Environmental Review No. ER- <br />2021-125 was filed for the project. <br />FISCAL IMPACT <br />On July 20, 2021, the City Council approved the Revive Santa Ana Spending Plan and <br />appropriated $750,000 of American Rescue Plan Act (ARPA) funding for Design and <br />Construction of this project. With the approval of the amendment to the Fiscal Year 2021- <br />22 Capital Improvement Program will officially incorporate this project into the program. <br />With approval of the $200,000 Appropriation Adjustment, to move the funding from <br />Reserve for Revenue Loss Allocation account (No. 18110013-69011) to the Stormwater <br />Channel Fencing Upgrades Phase II Project account (No. 18117013-66220), the new <br />total project budget will be $950,000 (Exhibit 5). As indicated in the Cost Analysis, the <br />estimated total construction delivery cost of the project is $849,348, which includes <br />construction, contract administration, inspection, testing, and an authorized contingency. <br />The remaining $100,652 was allocated for project Design Engineering. <br />The following table summarizes the funds budgeted and available for expenditure to <br />deliver this project. <br />