My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - City Hall 3rd Floor Tenant Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/05/2022 Special and Regular & HA
>
Item 18 - City Hall 3rd Floor Tenant Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2024 9:28:20 AM
Creation date
8/16/2023 10:33:04 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
18
Date
4/5/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Hall V Floor Tenant Improvements <br />April 5, 2022 <br />Page 2 <br />only the physical aesthetics of the floor but also keep our facility in compliance with the <br />latest building codes and the American Disability Act. <br />Public Outreach and Contractor Participation <br />To provide an opportunity for local vendors to submit bids, a Notice Inviting Bids was <br />advertised in the Orange County Register newspaper on November 23 and November <br />30, 2021. The project was also advertised on PlanetBids, and bids were received <br />electronically via PlanetBids on January 27, 2022. <br />The City notified a total of 886 regional vendors via PlanetBids, 44 of which are Santa <br />Ana -based. There were 105 vendors who requested bidding documents. A total of four <br />bids were received. However, no bids were received from any Santa Ana contractors. <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID <br />1 <br />Allinone Construction, Inc. <br />La Habra <br />$427,051.62 <br />2 <br />Elegant Construction, Inc. <br />Irvine <br />$629,000.00 <br />3 <br />Rhome Profile Construction <br />Bellflower <br />$829,792.00 <br />4 <br />MBC Enterprises, Inc. <br />Westminster <br />$855,000.00 <br />All four bids were deemed responsive. Allinone Construction, Inc. submitted the lowest <br />responsive base bid in the amount of $427,051.62 (Exhibit 2). As specified in the bid <br />documents, the lowest bid shall be determined on the basis of the Base Bid. Based on <br />the bid analysis and a contractor's reference check, staff recommends awarding the <br />construction contract to Allinone Construction, in the amount of the base bid totaling <br />$427,051.62 (Exhibit 3). Allinone Construction has not performed any work in the City of <br />Santa Ana within the past five years. Staff is confident this contractor will perform and <br />produce quality work for the city. <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes construction administration, inspection, and testing, along <br />with an allowance for contingencies to account for unexpected or unforeseen conditions. <br />Construction administration and inspection includes the following: construction <br />management; implementation of the City's Community Workforce Agreement <br />requirements; inspection of the Contractor's work to ensure contract compliance, <br />workmanship, and quality; and materials testing. As indicated in the Cost Analysis (Exhibit <br />4) and as summarized in the table below, the estimated total construction delivery cost of <br />the project is $576,519.94. <br />
The URL can be used to link to this page
Your browser does not support the video tag.