My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Construction Contract for Main Street at 15th Street Traffic Signal Installation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
03/01/2022 Regular
>
Item 13 - Construction Contract for Main Street at 15th Street Traffic Signal Installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 11:17:44 AM
Creation date
8/16/2023 11:16:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
13
Date
3/1/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Contract for Main Street at 15th Street Traffic Signal Installation <br />March 1, 2022 <br />Page 4 <br />2 <br />4 <br />7 <br />2 <br />Construction Contract $413,942.00 <br />Construction Administration, Inspection, and Testing 68,300.00 <br />Contingencies 41,394.00 <br />ESTIMATED CONSTRUCTION DELIVERY COST $523,636.00 <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the recommended actions <br />are exempt from further review. Categorical Exemption Environmental Review No. ER- <br />2017-100 was filed for this project. <br />FISCAL IMPACT <br />As indicated in the Cost Analysis, the estimated total construction delivery cost of the <br />project is $523,636, which includes the construction contract, contract administration, <br />inspection, testing, and project contingency. Approval of the requested appropriation <br />adjustments will provide $440,140 in HSIP grant funding for this project through the <br />following transactions: <br />ď‚·Recognize $335,793 in Fiscal Year 2017-18 Highway Safety Improvement <br />Program grant funds into the Federal Aid Safety Program, Federal Grant-Indirect <br />revenue account (No. 14717002-52001), and appropriate the same amount into <br />the Public Services Street Safety Projects, Improvements Other Than Building <br />expenditure account (No. 14717611-66220). <br /> <br />ď‚·Recognize $104,347 in Fiscal Year 2021-22 Highway Safety Improvement <br />Program grant funds into the Federal Aid Safety Program, Federal Grant-Indirect <br />revenue account (No. 14717002-52001), and appropriate the same amount into <br />the Public Services Street Safety Projects, Improvements Other Than Building <br />expenditure account (No. 14717611-66220) <br />With approval of the reallocation of $83,496 in unspent Measure M2 Local Fairshare <br />funding, the total funding needed to deliver construction of this project will be achieved. <br />All funds will be available for expenditure in Fiscal Year 2021-22. However, any remaining <br />balances not expended at the end of the fiscal year will be carried forward into FY 2022- <br />23. <br />Approval of the Appropriation adjustment will recognize $33,549 in prior-year fund <br />balance in the Special Gas Tax Fund, Prior Year Carry Forward revenue account (No. <br />02917002-50001) and facilitate an interfund budgetary transfer from the Special Gas Tax <br />Fund Interfund Transfer account (No. 02917002-68000-59) to the Select Street <br />Construction Interfund Transfer account (No. 05917002-59000-29), and appropriate the <br />same amount into the Select Street Construction Fund, Improvements Other Than <br />Building expenditure account (No. 05917663-66220). The Gas Tax funds will be used to <br />cover the unreimbursed grant funds for Preliminary Engineering.
The URL can be used to link to this page
Your browser does not support the video tag.