My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 26 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
02/15/2022 Regular
>
Item 26 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:44:49 PM
Creation date
8/16/2023 11:49:02 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
26
Date
2/15/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pursuant to the GPU would not conflict with or obstruct implementation of a water quality <br />control plan or sustainable groundwater management plan. <br />(i) Land Use Planning: Implementation of the GPU would not divide an established community. <br />Additionally, the GPU would be consistent with the Airport Environs Land Use Plan for the <br />John Wayne Airport. Implementation of the GPU would be consistent with the goals of the <br />Southern California Association of Governments' RTP/SCS. Implementation of the GPU <br />would also be consistent with the OCTA Congestion Management Plan. <br />(j) Mineral Resources: Project implementation would not result in the loss of availability of a <br />known mineral resource. <br />(k) Noise: The proximity of the plan area to an airport or airstrip would not result in exposure of <br />future residents and/or workers to excessive airport -related noise. <br />(1) Population and Housing: The proposed GPU would provide more housing opportunities <br />than currently exist. Therefore, implementation of the GPU would not displace people and/or <br />housing. <br />(m) Public Services: The GPU would introduce new structures and allow for up to 22,361 new <br />residents and workers in the OCFA and Santa Ana Police Department service boundaries, <br />thereby increasing the requirement for fire protection facilities and personnel, as well as <br />increasing the service needs for the Main Library and the Newhope Library Learning Center. <br />The GPU would also generate additional students who would impact the school enrollment <br />capacities of the Santa Ana Unified School District, Garden Grove Unified School District, <br />and Orange Unified School District. However, upon implementation of regulatory <br />requirements and standard conditions of approval the project would not create significant <br />impacts related to fire protection services, police protection, library services, or school <br />services. <br />(n) Transportation and Traffic: The GPU is consistent with adopted programs, plans, and <br />policies addressing the circulation system, including transit, roadway, bicycle, and pedestrian <br />facilities. Additionally, GPU implementation would result in a reduction of vehicle miles <br />traveled per service population (VMT/SP) in comparison to existing City conditions, and <br />would achieve a VMT/SP at least 15 percent lower than the countywide VMT/SP. Finally, <br />circulation improvements associated with future development that would be accommodated <br />by the GPU would be designed to adequately address potentially hazardous conditions <br />(sharp curves, etc.), potential conflicting uses, and emergency access. <br />(o) Utilities and Service Systems: Development pursuant to the GPU would require or result <br />in the relocation or construction of new or expanded wastewater facilities. However, Orange <br />County Sanitation District (OCSD) has a functioning and effective process in place to ensure <br />the regional sewer infrastructure will support future developments under the Santa Ana GPU. <br />Additionally, OCSD and OC Water District have adequate capacity to serve development <br />pursuant to the GPU in addition to the providers existing commitments. Development <br />Santa Ana General Plan Update <br />CEQA Findings of Fact and Statement <br />Of Overriding Considerations -24- <br />October 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.