Laserfiche WebLink
Aws <br />STATEWIDE <br />SAFETY SYSTEMS <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONT <br />Branch Manager <br />a. TOTAL I b. <br />13 1 13 <br />15. FIRM NAME AND LOCATION (City and State) <br />Statewide Traffic Safety and Signs, Inc. - Santa Ana Branch <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />A.S. Business Management I N/A <br />19. RELEVANT PROJECTS <br />(2) YEAR COMPLETED •LOCATION TITLE <br />Branch • _ PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />N/A Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />a. <br />Manages Statewide operations in out or Santa Ana branch which services Los Angeles and Orange Counties of California. Projects under <br />my management range from construction area signs, traffic design, traffic control, traffic detours, temporary and permanent signage, crash <br />attenuation, and work zone safety. <br />■ • • • (2) YEAR COMPLETED <br />• • • • • • PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />N/A 2017-2020 <br />b <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />Branch Manager <br />On -Call Traffic Control Contract <br />(1) TITLE ■ LOCATION (City and (2 YEAR COMPLETED <br />-■- • • California PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />County ofOrange <br />N/A 2018-2019, 2020 — <br />Current Contract <br />c- <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />Branch Manager <br />On -Call Traffic Control Contract <br />■ • • (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />N/A 2016 <br />I <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />d. <br />Branch Manager <br />Work included managed traffic control, construction area signs, crash arrays, temporary and permanent signage, overhead signs and <br />structures, and rentals & sales of traffic control and safety equipment. <br />Project widened the 1-405 through the Sepulveda pass from 1-10 to US Route 101, and overall construction cost was >$1 billion. Statewide <br />ortion of work was roughly S55 million. <br />■ • • • (2) YEAR COMPLETED <br />' - • ■ • • - • ROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) <br />N/A 2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ® Check if project performed with current firm <br />e. <br />Branch Manager <br />Work includes permanent roadside signs, PCBM's (permanent concrete barrier markers), and Class 1 Delineators. <br />Overall construction valued at — $318 million-, Statewide subcontracted For — $119K. <br />S'(a'O �vvideTraffic Saf;ery & Signs DBA. SC.at` 2 \dd Dd =211," <br />_100 S Main S[Lree[—te, lali ''rvini , 1-9 92/b .1 5 ,3i2\'U!G255, Oi;1 <br />'iN,2-vada + <br />