Laserfiche WebLink
STATEWIDE <br />SAFETY SYSTEMS <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. L2GLE IN THIS CONTRACT 14. YEAKb tAHt KItNL:t <br />Dispatcher / Project Manager C. TOTAL d. WITH CURRENT FIRM <br />29 9 <br />15. FIRM NAME AND LOCATION (City and State) <br />Statewide Traffic Safety and Signs, Inc. — Santa Ana Branch <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />N/A I N/A <br />ly. KtLtVANI t MUJCL. 0 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />N/A Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ® Check if project performed with current firm <br />a Dispatcher / Project Manager for Statewide out or Santa Ana branch which services Los Angeles and Orange Counties of California. <br />Dispatch and coordinate labor, material and equipment for projects relating to construction area signs, traffic design, traffic control, traffic <br />detours, temporary and permanent signage, crash attenuation, and work zone safety. <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) <br />N/A 2017-2020 <br />b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE ®Check if project performed with current firm <br />Dispatcher / Project Manager <br />On -Call Traffic Control Contract <br />YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />N/A 2018-2019, 2020 — <br />Current Contract <br />c• (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />Dispatcher / Project Manager <br />On -Call Traffic Control Contract <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION(Ifapplicable) <br />N/A 2016 <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />d. Dispatcher / Project Manager <br />Work included managed traffic control, construction area signs, crash arrays, temporary and permanent signage, overhead signs and <br />structures, and rentals & sales of traffic control and safety equipment. <br />Project widened the 1-405 through the Sepulveda pass from 1-10 to US Route 101, and overall construction cost was >$1 billion. Statewide <br />portion of work was roughly $55 million. <br />(2) YEAR COMPLETED <br />4L SERVICES CONSTRUCTION (If applicable) <br />N/A 2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ® Check if project performed with current firm <br />e. <br />Dispatcher / Project Manager <br />Work includes permanent roadside signs, PCBM's (permanent concrete barrier markers), and Class 1 Delineators. <br />Overall construction valued at — $318 million; Statewide subcontracted for — $119K. <br />j[di✓��iil(�� Ti"� i.. �ci. l`� & �lil,"i� (�;=fi Jr�!.��/\li�i �rl •: __ni ;J \�c�_�!?�� <br />!_ 1 QI, S Main ' ;"EE St'. 1U0 _rkA ieC (_`,4 '?26 1_' <br />Pavia: IZev,--,llc '_.'eg'OI'I <.aS i %rail <br />