My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 32 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Item 32 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 2:43:13 PM
Creation date
8/16/2023 2:43:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
32
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recirculated Draft PEIR to discuss and evaluate impacts related to environmental justice, to <br /> conclude that the recreation-related impacts of the proposed GPU would result in a significant <br /> impact, and to define a new project alternative to reduce recreational impacts. <br /> ■ The City recirculate the Draft PEIR chapters that had been revised and the NOA was released <br /> for a 45-day public review period from August 6, 2021 through September 20, 2021. The NOA <br /> directed reviewers to only submit comments on the revised Draft PEIR chapters included in <br /> the Recirculated Draft PEIR since the comments in the Final PEIR adequately addressed <br /> comments received on portions of the Draft PEIR that had not been recirculated. <br /> ■ One September 131h, the City conducted a Planning Commission Study Session to discuss <br /> the Recirculated Draft PEIR. Verbal comments from the public, received during the Study <br /> Session were addressed in the Final Recirculated PEIR. <br /> ■ After considering the PEIR and in conjunction with making these findings, the City of Santa <br /> Ana hereby finds that, pursuant to Section 15092 of the CEQA Guidelines, approval of the <br /> project will result in significant effects on the environment; however, the significant effects will <br /> be eliminated or substantially lessened where feasible, and the City has determined that <br /> remaining significant effects are acceptable under Section 15093. <br /> ■ The Mitigation Monitoring and Reporting Program is hereby adopted to ensure implementation <br /> of feasible mitigation measures identified in the PEIR. The City of Santa Ana finds that these <br /> mitigation measures are fully enforceable conditions on the project and shall be binding upon <br /> the City and affected parties. <br /> ■ The City of Santa Ana finds that the project is in the public interest and is necessary for the <br /> public health, safety, and welfare. <br /> ■ The City of Santa Ana hereby certifies the Final Recirculated PEIR in accordance with the <br /> requirements of CEQA. <br /> ■ Pursuant to CEQA Guidelines Section 15095, staff is directed as follows: a) copy of the Final <br /> Recirculated PEIR and CEQA Findings of Fact shall be retained in the project files; b) copy of <br /> the Final Recirculated PEIR and CEQA Findings of Fact shall be provided to all CEQA <br /> "responsible" agencies. <br /> Santa Ana General Plan Update <br /> CE 5T ac an Statement 32 — 43 2 <br /> Of ri ing onsiderations -20- 61 /Rer�0 2 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.