My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 32 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Item 32 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 2:43:13 PM
Creation date
8/16/2023 2:43:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
32
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Measures <br /> There are no feasible mitigation measures to mitigate the population and housing growth at <br /> buildout. <br /> Finding <br /> Finding 3. The City finds that there are no mitigation measures that are feasible, taking into <br /> consideration specific economic, legal, social, technological or other factors, that would mitigate <br /> this impact to a less-than-significant level, and further, that specific economic, legal, social, <br /> technological, or other considerations, including considerations for the provision of employment <br /> opportunities for highly trained workers, make infeasible the alternatives identified in the PEIR, as <br /> discussed in Section G of these Findings (Public Resources Code§§21081(a)(1), (3); Guidelines <br /> §§ 15091(a)(1), (3)). As described in the Statement of Overriding Considerations, the City has <br /> determined that this impact is acceptable because specific overriding economic, legal, social, <br /> technological, or other benefits, including regionwide or statewide environmental benefits, of the <br /> GPU outweigh its significant effects on the environment. <br /> Santa Ana General Plan Update <br /> CE 5T ac an Statement 32 — 75 2 <br /> Of ri ing onsiderations -52- 61c o er�0 2 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.