My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - Water Control Panel Building Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Item 23 - Water Control Panel Building Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:04:19 PM
Creation date
8/16/2023 3:00:09 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
23
Date
1/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ KDC Systems <br />An EMCOR Company <br />Details <br />The core system is 8,000 10 points with an additional 7,000 points being monitored in <br />sub -systems. DeltaV Version 11, M Series Hardware, Delta V Historian and Win 911 were <br />utilized. Both Fieldbus and DeviceNet were used on these projects <br />Perhaps the biggest challenge in this project was the fact that the process itself was <br />somewhat experimental. Nobody had ever attempted to clean up effluent from a <br />Wastewater Facility to drinkable level on this scale before. The experimental nature of <br />the process resulted in the need to absorb multiple changes to the control narrative <br />during the course of the project. <br />To facilitate this collaborative effort, we conducted Design Workshops. The purpose of <br />these Workshops was to get input from all stakeholders and get their sign off on the <br />design. A custom software library was built and maintained. This library was managed <br />and pushed out to sub -vendors who were responsible for providing some of the sub- <br />systems. <br />The control system was built and tested off -site using a Test Platform. Rigorous testing <br />protocols were developed with the engineer and OCWD. Unwitnessed and witnessed <br />testing was conducted at our facility using the Test Platform. The thoroughly tested <br />code was then deployed on -site, greatly reducing startup time and issues. The same <br />testing was then repeated in the field on actual equipment with water to commission <br />the system. <br />Another, challenge on this project was the use of the DeltaV DCS. DeltaV is a very <br />powerful and highly integrated process controls technology which can be challenging to <br />implement. KDC Systems has mastered this technology and as a result OCWD has <br />repeatedly chosen to use us over the local Emerson business partner. <br />Page 115 <br />_ KDC Systems <br />An EMCOR Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.