My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Contract for Sewage Grinder Units
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/21/2021 Regular
>
Item 20 - Contract for Sewage Grinder Units
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 8:26:21 AM
Creation date
8/16/2023 3:47:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
12/21/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b) The integrity of the quality management system. <br />c) The availability of resources. <br />d) The allocation or reallocation of responsibilities and authorities. <br />7. Support <br />7.1. Resources <br />7.1.1.General-Powers Bros. has determined and provided the Internal and External resources <br />needed for the establishment, implementation, maintenance, and continual improvement of <br />the quality management system. These resources are included but not limited to: <br />7.1.2. People: Necessary persons are determined and provided for the effective implementation of <br />QMS and for the operation and control of processes. <br />7.1.3.infrastructure: The necessary infrastructure for the operation of processes and to achieve <br />conformity of products and services has been determined and provided. <br />7.1.4.Environment for the operation of processes: A suitable environment, a combination of <br />human and physical factors is determined and provided to QMS processes. <br />7.1.5.Monitoring and measuring resources: Powers Bros. has determined and provide the <br />measurement and test equipment to ensure valid and reliable results when monitoring or <br />measuring to verify the conformity of products according to Calibration Procedure <br />(QMSP105). <br />The Measurement and test equipment are <br />A. Calibrated or verified <br />B. Identified and determined by according to their status <br />C. Safeguarded from adjustment, damage, or deterioration. <br />7.1.6.Organizational knowledge: <br />A. Internal Knowledge: Powers faros fosters an open opinion atmosphere for every employee to <br />be heard and to contribute their individual experiences and expertise. Knowledge from skilled <br />tradesman, Account Managers and management input is taken into consideration and shared <br />amongst the company through formal and informal communication. <br />B. External Knowledge: Customer knowledge and contributions to process is captured by <br />Account Managers and shared amongst company. Industry standards are utilized when <br />appropriate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.