My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Grovemont Street Water Main Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
11/16/2021 Regular
>
Item 14 - Grovemont Street Water Main Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 10:14:01 AM
Creation date
8/16/2023 5:19:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
14
Date
11/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Agency <br />www.santa-ana.org/pw <br />Item # 14 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br />Staff Report <br />November 16, 2021 <br />TOPIC: Grovemont Street Water Main Improvements <br />AGENDA TITLE <br />Award a Construction Contract to Stephen Doreck Equipment Rentals, Inc., in the Amount <br />of $1,265,465 for the Grovemont Street Water Main Improvements FY 2021-22 Project, <br />with an Estimated Project Delivery Cost of $1,645,105 (Project No. 21-6466) (Non - <br />General Fund) <br />RECOMMENDED ACTION <br />1. Award a construction contract to Stephen Doreck Equipment Rentals, Inc., the lowest <br />responsible bidder, in accordance with the base bid in the amount of $1,265,465, for <br />construction of the Grovemont Street Water Main Improvements FY 2021-22 Project, <br />for the term beginning January 3, 2022, and ending upon project completion, and <br />authorize the City Manager to execute the contract subject to non -substantive <br />changes approved by the City Manager and the City Attorney. <br />2. Approve the Project Cost Analysis for a total estimated construction delivery cost of <br />$1,645,105, which includes $1,265,465 for the construction contract; $189,820 for <br />contract administration, inspection and testing; and $189,820 in project contingency <br />for unanticipated or unforeseen work. <br />DISCUSSION <br />The Public Works Agency Water Resources Division monitors the condition of water main <br />pipelines by assessing critical factors such as history of breaks, pipe size, alignment, <br />location, and system redundancy, to determine replacement priorities. The existing 6- <br />inch-diameter asbestos cement water main, which was installed in the 1960s, has been <br />experiencing a number of significant breaks and leaks, and has been identified as a <br />priority for replacement. <br />The Grovemont Street Water Main Improvements Project will include replacement of <br />approximately 3,580 linear feet of 8" polyvinyl chloride (PVC) water main and <br />approximately 40 linear feet of 12" PVC water main, plus all necessary appurtenances <br />related to the new water facilities in the area identified in Exhibit 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.