My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Grovemont Street Water Main Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
11/16/2021 Regular
>
Item 14 - Grovemont Street Water Main Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 10:14:01 AM
Creation date
8/16/2023 5:19:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
14
Date
11/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Grovemont Street Water Main Improvements <br />November 16, 2021 <br />Page 2 <br />Public Outreach and Contractor ParticipationAs legally required, a Notice Inviting Bids <br />was advertised in the Orange County Register newspaper on September 7 and 8, 2021. <br />The project was also advertised in PlanetBids from August 31, 2021, through September <br />28, 2021. To provide an opportunity for local vendors to submit bids, the City <br />electronically notified a total of 535 regional vendors, many of which are based in Santa <br />Ana. Fifty-five vendors requested bidding documents, and a total of nine bids were <br />received. No bids were received from Santa Ana contractors. <br />Bid Results Summ <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID <br />1 <br />Stephen Doreck Equipment <br />Rentals, Inc. <br />Pico Rivera <br />$ 1,265,465.00 <br />2 <br />J. De Sigio Construction <br />Baldwin Park <br />$ 1,573,772.00 <br />3 <br />Vido Samarzich, Inc. <br />Rancho <br />Cucamonga <br />$ 1,577,010.00 <br />4 <br />SRK Engineering <br />Escondido <br />$ 1,803,800.00 <br />5 <br />Ramona Inc. <br />Baldwin Park <br />$ 1,843,465.00 <br />6 <br />Excel paving Co <br />Long Beach <br />$ 1,919,845.00 <br />7 <br />Colich & Sons L.P. <br />Gardena <br />$ 2,582,075.00 <br />8 <br />Murray Company <br />Rancho <br />Do min uez <br />$ 2,669,114.00 <br />9 <br />CEM Construction Corp. <br />Montebello <br />$ 3,240,510.00 <br />All nine bids received were deemed responsive. Stephen Doreck Equipment Rentals, <br />Inc., submitted the lowest responsive base bid in the amount of $1,265,465 (Exhibit 2). <br />As specified in the bid documents, the lowest bid shall be determined on the basis of the <br />Base Bid. Based on the bid analysis and a contractor's reference check, staff <br />recommends awarding the construction contract to Stephen Doreck Equipment Rentals, <br />Inc., in the amount of the base bid totaling $1,265,465 (Exhibit 3). Stephen Doreck <br />performed three previous projects for the City of Santa Ana: <br />• Project 10-6403 Catalina Street Pump Owner's Association Water Service <br />Connection <br />• Project 15-6448 Thornton Park Neighborhood Water Main Improvements <br />• Project 21-6457 Valley Adams Neighborhood Water Main Improvements Phase 2. <br />Proiect Delive <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes construction administration, inspection, and testing, along <br />
The URL can be used to link to this page
Your browser does not support the video tag.