My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Agreements for On -Call Right -of -Way Specialty Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
11/16/2021 Regular
>
Item 18 - Agreements for On -Call Right -of -Way Specialty Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 10:17:41 AM
Creation date
8/16/2023 5:22:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
18
Date
11/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RAMIE DAWIT <br />SENIOR AGENT <br />14 YEARS IN THE INDUSTRY <br />EDUCATION <br />BACHELORS DEGREE <br />Communications, California State <br />Polytechnic University <br />_ LICENSES <br />REAL ESTATE BROKER <br />State of California <br />CA#01144880 <br />NOTARY PUBLIC <br />State of California <br />moo AFFILIATIONS <br />INTERNATIONAL RIGHT-OF-WAY <br />ASSOCIATION {IRWA} <br />WOMEN'S TRANSPORTATION <br />SEMINAR (WTS) <br />Ramie is experienced in all aspects of real estate and right-of-way management <br />including property negotiations, relocation assistance, title and escrow, appraisal <br />methodologies, utility relocations, property management and certification. She has <br />successfully managed the acquisition and relocation of over 5,000 cases spanning <br />her 14 year career and is well versed in the application of all state and federal laws, <br />including implementation of the Caltrans Manual and FTA guidelines. In addition <br />to having managed multiple large and small scale design build and design bid <br />build projects, she provides detailed project management plans, cost estimates <br />and budgetary reports for large public sector projects and has demonstrated <br />experience with resolution of right-of-way encroachment issues, utility verifications <br />and relocations, and formulating risk mitigation strategies_ <br />E X P E R I E N C E <br />WEST VALLEY CONNECTOR BUS RAPID TRANSIT PROJECT <br />cur' GCrllar' i L Lri y ,rur,32�,iu,�r,r1 f,iUi lj I r Ler; ; vino, CA 1 2020 - <br />Oncn -c <br />This is a 35 mile long street widening to accommodate a bus travel lane including <br />60 station platforms and 33 intersection improvements. Ramie is the Project <br />Manager responsible for the oversight and management of the program and four <br />Consultant teams. She is responsible for preparation of the RAMP, bid documents <br />for appraisal, right-of-way engineering and right-of-way services. Ramie drives the <br />schedule and works collaboratively with the client to deliver the project_ <br />CALIFORNIA HIGH SPEED -RAIL PROJECT <br />Co�ifornia High -Speed Rail Authority: 2016 - Ongoing <br />The California Highspeed mail Authority is responsible for planning, designing, <br />building, and the operation of the first high-speed rail system in the nation. Ramie <br />was part of the consultant team providing right-of-way support on Construction <br />Package 1, a 23-mile segment between Avenue 19 in Madera County to East <br />American Avenue in Fresno County. She organized and managed an intense <br />conveyance and permit process for the Authority preparing and tracking over <br />1000 conveyance packages including coordination with owners, utilities and <br />stakeholders. <br />1-10 EMPRESS LANES PROJECT <br />San Bernardino County Transportation Authority I San Bernardino, CA 12017 - 2019 <br />Ramie was the Project Manager and managed the acquisition services to over <br />200 properties affected by this design -build freeway widening project. She was <br />responsible for the coordination with acquisition and relocation teams, escrow, title, <br />and appraisal firms. Ramie maintained a monthly project schedule and controlled <br />right of way capital costs. <br />STATE ROUTE 91 CORRIDOR IMPROVEMENT <br />Riverside CoUrtV Transportation Comm'ssion ' R verside, CA r 2012 - 2017 <br />This was a high -profile, politically sensitive design -build project involved over 450 <br />partial and full acquisitions with varying degree of difficulty, and approximately <br />250 residential and business relocations. This project widened approximately 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.