Laserfiche WebLink
All soil and test hole data, groundwater elevations, and soil analyses included within the above <br />geotechnical report apply only at the location of the test holes and to the depths indicated at the <br />date of that the boring was performed. The Contractor is obligated to obtain further geotechnical <br />information for his use and design and construction considerations should his engineers believe <br />it is necessary. This additional subsurface exploration shall be performed by the Contractor at <br />his own expense. <br />J. Project Signs <br />The Contractor shall post four (4) public information signs at least fourteen (14) days <br />prior to construction or delivery of material or equipment to the construction site. The <br />City shall approve the sign location in the field. The project sign shall remain in place <br />until all construction has been completed. <br />2. Project signs shall be placed at the following locations: two on Ritchey Street at the project <br />limits; one at the SA-7 Facility; and one at the entrance to the RICOH property on <br />Warner Avenue. <br />3. Dimensions of the sign shall be 4-feet by 8-feet mounted on 4-inch by 4-inch wooden posts. <br />Signs shall be white with black letters. The lettering and layout shall be provided by <br />the City. The sign shall be made of metal by a firm regularly engaged in the business of <br />sign making. If the face of the sign is defaced in any manner, the Contractor shall correct <br />immediately. <br />K. Order of Precedence of Contract Documents <br />In resolving conflicts resulting from errors, discrepancies, ambiguities, or inconsistencies in any <br />of the Contract Documents, the order of precedence shall be as follows: <br />1. Permits from other agencies as may be required by law. <br />2. Change orders <br />3. Agreement <br />4. Addenda <br />5. The Bid <br />6. Special Provisions <br />7. Technical Special Provisions <br />8. Drawings <br />9. Standard Specifications for Public Works Construction <br />10. Advertisement for Bid <br />11. Instruction to Bidders <br />L. Order of Precedence of the Drawings <br />With reference to the Drawings, the order of precedence is as follows: <br />Figures govern over scaled dimensions <br />City of Santa Ana RFP 21-066 <br />Page Al-11 <br />