Laserfiche WebLink
SR-55/Ritchey Water Improvement Project <br />Construction Management & Inspection Services <br />Berg routinely manages public works projects that utilize <br />Federal Aid, and we understand the requirements and <br />regulations that apply in order to govern construction. <br />We are very familiar with the Caltrans Local Assistance <br />process and the Construction (RE) Manual, which we <br />utilize on the majority of our projects. <br />Berg has an outstanding track record and long history of <br />working with cities and regional transportation agencies <br />to administer and manage federally funded Caltrans <br />Local Assistance projects. Caltrans has recognized us as <br />qualified consultants to provide inspection and engineering <br />for bridges and roadway construction and reconstruction <br />for federally funded projects. We have provided these <br />services for cities throughout Southern California from La <br />Quinta to Simi Valley. <br />In our ten years as a Prime Consultant on the Alameda <br />Corridor, we facilitated the completion of nine different <br />construction projects, all federally funded. The bridges <br />and grade separations were administered under the <br />Caltrans Local Assistance Procedures, and these same <br />procedures were applied to each project. On each of these <br />projects Berg was the Prime Construction Management <br />Consultant and we provided Resident Engineering, <br />Administration, Compliance and Documentation, Project <br />Controls, and Quality Assurance. <br />Recently, Berg managed two grade separations that <br />were federally funded; one for the City of Fullerton in <br />conjunction with the Orange County Transportation <br />Authority (OCTA), and one for the San Gabriel Valley <br />Council of Governments (SGVCG), formerly Alameda <br />Corridor East (ACE) Construction Authority in the City of <br />Industry. For each of these, we provided all staff to oversee <br />field operations, coordinate quality assurance, track and <br />compile project documentation and monitor compliance <br />with funding sources. <br />BERG FEDERALLY FUNDED & <br />LOCAL ASSISTANCE PROJECTS <br />(Partial List) <br />Green Port Gateway Project (Track Realignment <br />at Ocean Blvd. and Pier F Support Yard), POLB <br />Harry Bridges Street Improvements, POLA <br />Avenida Banderas Overcrossing, City of Rancho <br />Santa Margarita <br />El Toro Creek Crossing, County of Orange <br />Limonite Grade Separation, RCTC <br />Lincoln Ave Overcrossing, City of Corona <br />Lakeshore Drive, Lake Elsinore <br />Seaside Avenue/Ocean Blvd., POLB <br />Madera Rd. Overcrossing, City of Simi Valley <br />Union Ave. Overcrossing, City of Bakersfield <br />Chester Ave. Undercrossing, City of Bakersfield <br />1/10 Riverside Avenue Interchange, SBCTA <br />SR 60/HOV Lane Construction and Bridge <br />Widenings of 5 interchanges, RCTC <br />Portola Bridge, City of Palm Desert <br />Washington Street Bridge Widening over <br />Whitewater Wash, City of La Quinta <br />Gilbert Avenue Undercrossing, City of Fullerton <br />Alameda Corridor Transportation Authority <br />(ACTA) projects: <br />• Dominguez Channel Overcrossing <br />• Compton Creek Bridge <br />• Alameda Corridor Overcrossing <br />• Dominguez Channel Filler Bridge <br />LANI Parks and Pocket Parks, Los Angeles <br />Antelope Rd. Safety Median, City of Menifee <br />For each of these projects, Berg was responsible for compliance with federal regulations as prescribed <br />in the Caltrans Local Assistance Manual. For our entire existence as a company, we have adhered to <br />Caltrans procedures and standards, even when not required to do so. <br />Some of our standard operating procedures for administration of federally funded projects include: <br />• Working with Cities for accurate project pricing for verification of funding and final E-76 for Federal <br />Authorization to proceed. <br />• Review approvals from CTC and permit agencies are in place. <br />• Compliance with FARs in all indirect cost certifications, reviews, and rates. <br />• Compliance with Prevailing Wage requirements as determined by the DIR. <br />• Utilization of Caltrans payment forms for the construction contractor and compilation of back up <br />documentation to ensure progress payments are in conformance with scope and finance letter. <br />Berg & Associates, Inc. 3 <br />