ADMIN <br />CONSTRUCTION, 450 WD's =•21.7 months <br />F24o25 D26 <br />PHI SA-7 <br />CM <br />Activity Description Duration Begin End <br />NTP <br />1 2 <br />N D <br />3 4 5 6 7 8 9 10 . 12 13 14 IS I6 1] 18 19 20 21 22 <br />1 F M A M 1 1 A S O N D 1 F M A M 1 J A <br />23 <br />S O N D <br />27 18 29 30 <br />1 F M A <br />QOSEOVT <br />Award CM Contract CITY 1 <br />Constructability Review CM 22 <br />Award Construction Contract CITY 1 <br />Pre -Construction Mtg ALL 1 <br />Adrhm Notice To Proceed (A-W) CITY 1 <br />SWPPPSubmittal CONTR <br />HASP Submittal CONTR <br />Schedule Submittal CONTR <br />HOT Submittals <br />Potholing Plan Submittal CONTR <br />Electrical ED ui p/Instrumentation Pres Reduc Ste CONTR <br />Traffic Control Plan CONTR <br />Pipe Submittals CONTR <br />Shoring Plan Sbmtl- Ritchey St Relocation CONTR <br />Shoring Plan Sbmll- Pressure Reducing Sta CONTR <br />Shoring Plan Sbmtl-SR-55 Bore Excavation CONTR <br />Work Plan Sbmtls- Ritchey St Pipe Install CONTR <br />Work Plan Sbmtls- Pres, Reduc Sta Install CONTR <br />Work Plan Sbmtls-30"&42"lack/Bore CONTR <br />Pres Reduc Facility Commission/Activate Plan CONTR <br />Construction Notice To Proceed)D-NTP) CITY 1 11/01/21 <br />450 11/01/z1 08/21/23 <br />EL <br />Install Construction Signs&Traffic Control CONTR <br />Install list SWPPP BMP's CONTR <br />Locate Utilties/Pothole CONTR <br />Clear & Grub /Removals CONTR <br />Install 2 nd SWPPP BMP's CONTR <br />Procure Pi pe and Appurtanances CONTR <br />260.8"C900 PVC DR-14 CONTR <br />1,144'I6"C905PVCDR-18 CONTR <br />120'16"Class 250 DIP CONTR <br />9. Service Laterals CONTR <br />Mustbe1mdln Prior <br />Install Misc FH's, FDC's CONTR <br />to SA-7 Activation <br />Cutover/Tl&in lindudingservica and FH's) CONTR <br />Abandon 24"Main w/Slurry CONTR <br />Abandon 16"Main w/Slurry CONTR <br />MCI Instal l FO Line <br />■ <br />Overlay Ritchey St <br />Te In Fi re Servi ces& Flre Hydrants <br />Per RFP Pg Al-7, Sect D: <br />SR-55 Water Crossing Relocation <br />Awaiting ROW at RICOH & Western Exterminator <br />Procure Casing and Pipe CONTR <br />lack& Bore Casingsand Pipe CONTR <br />Construct Pipe Outsideof Bore CONTR <br />SCE Relocation of Power Poles IIIII <br />East Si de SR-55 Repair Landscaping <br />Per RFP PRAT-7 Sect DA (1111111111111111 <br />Coord l nate with OCTA, <br />liU S4-7 Pressure Reducing StRelocll� <br />Mai main Operation CONTR <br />Procure Pipe CONTR <br />Ensure Caltrans Advance <br />Procure Electical & Instrumentation CONTR <br />Notification <br />Construct SA-7 Phase I Work CONTR <br />Caltrans Compl ete RCB Work <br />. 1'ar Rf4'Aswine l2anontfisfor Caltrans RCB . <br />Install Landscape&Irrigation CONTR <br />} <br />Begin After Bore Pits <br />PH-2 SA-7 Pressu, <br />Backfilled <br />/ <br />Complete Ph Work(& minor landscape) CONTR <br />Per RFP Pg AI-8 Sect D.B: <br />WorkC <br />Coordinatewith OCTA <br />Complete Welkthru&Punchlist CONTR <br />Positions Personnel <br />Project Manager Dave Smith, PE, QSD <br />�����������������. <br />■� <br />m� <br />Lead Inspector/CM Mike Masengale <br />Contract Administrator Brenda Ramirez, MPA <br />MENEEMEMENMENEM IN <br />�� <br />ME <br />Peeklnspector Ryan Moore/John Martin <br />i��������������. <br />�E <br />ME <br />Utility Coordinator Dominic Costello <br />ME <br />Special Inspections/Commissioning ON51TETechnical <br />omm <br />Resource Utilicition QS% c50% O5% a00% <br />Legend <br />SR-55/Ritchey Water Improvement Project <br />Construction Management & Inspection Services <br />Notes from Project Manager, Dave Smith, PE, QSD <br />A. Issue: The Contract time noted in the Specifications does not allow for the work to be completed <br />within the requirements as identified in the RFP. <br />1. Project commences 11/1/21, has 450 WD's, plus the 80 WD for PH-2 (per Addendum) and therefore, <br />must end-12/15/23 (See items B.1 & B.2 below). <br />2. Cannot begin SR-55 Jack & Bore till 7/1/22 and this operation is to take 4 months (See items B.3, .4, .5 <br />& .6 below), therefore Jack & Bore begins on WD 167 and ends on WD 250. <br />3. Cannot begin SA-7 Pressure Reducing Facility Phase 1 until SR-55 Jack & Bore is done (See Item B.6 <br />below), therefore SA-7 Ph-1 begins WD 251 and ends -40 WD later WD 291. <br />4. Caltrans to complete RCB adjacent to SA-7 facility between Phase 1 & 2, and is allowed 12 months to <br />complete this (See Item 7), therefore Caltrans RCB work begins WD 291 and ends WD 537. <br />5. SA-7 Ph-2 cannot commence until Caltrans RCB window (12 months) is complete and SA-7 Ph-2/ <br />Closeout is allowed to take 4 months, therefore this work begins WD 537 and ends WD 617. <br />6. Based on critical path, the contract would take an additional -80 WD's beyond the allotted 530 WD's. <br />B.Background <br />1. The provided Contract Specifications (section PRPOSAL, page P-6 of P-21) indicate the Contractor has <br />450 working days to complete all work except PH-2, and PH-2 is allowed 80 working days. Addendum <br />2 identified these as not concurrent therefore requiring 530 WD. This is approximately 26 months total. <br />2. The CM RFP section INTRODUCTION/BACKGROUND, page A1-1, 1st paragraph, states that <br />construction to begin fall of 2021. For these purposes, we have assumed begin November 1, 2021. <br />3. The CM RFP section INTRODUCTION/BACKGROUND, subsection Location of Project Sites, page A1- <br />3, 3rd paragraph, states that construction in the new Santa Ana (Western Exterminators) right of way <br />and easements may not commence until June or July 2022. For these purposes, we have assumed <br />July 1, 2022. <br />4. The CM RFP section INTRODUCTION/BACKGROUND, subsection Location of Project Sites, pageA1- <br />3, 5th paragraph, states that construction in the RICOH right of way and easements may not commence <br />until June or July 2022. For these purposes, we have assumed July 1, 2022. <br />5. The CM RFP section ADDITIONAL CONSTRUCTION INSTRUCTIONS/INFORMATION, subsection D <br />Sequence of Construction, page Al-7, paragraph 2 and 3, reiterate comments 3 and 4 noted above. <br />6. The CM RFP section ADDITIONAL CONSTRUCTION INSTRUCTIONS/INFORMATION, subsection D <br />Sequence of Construction, sub -item 1, page A1-7, states that construction of the jack and bore under <br />the SR-55 shall be completed prior to construction of the relocated SA-7 Facility, and that the Jack & <br />Bore to be assumed to take 4 months. <br />7. The CM RFP section ADDITIONAL CONSTRUCTION INSTRUCTIONS/INFORMATION, subsection D <br />Sequence of Construction, sub -items 6, 7 & 8, page Al-8, states that: <br />a. The Freeway Widening project can not begin until the existing SA-7 facility is taken out of <br />service (new one is in service, Phase 1), <br />b. No new site improvements can be constructed on the Caltrans easement until Caltrans <br />contractor has constructed their new 8' x 4' RCB. These new site improvements are known as <br />Phase 2. <br />c. The Caltrans work is to be assumed to take 12 months. <br />C. Potential Resolutions <br />1. Extend the Contract time to allow for the needed time of Caltrans 12 month window. This would <br />increase the time by approx. 80 WD's to approx. 600. <br />2. Make the portion of the Caltrans window that does not have contract work on it, non -contract working <br />days as long as the City contractor is not working. This would add approximately 4 months (80 WD's). <br />3. Allow all submittals and pipe procurement to occur during an administrative NTP and begin the Project <br />construction (NTP) at a later date instead of November 2021 (see item B.2 above). <br />Berg & Associates, Inc. 19 <br />