Laserfiche WebLink
DAVE SMITH <br />Project Manager <br />PE, QSD/QSP <br />Position with the Company <br />Experience <br />Project Manager &Resident <br />Engineer <br />Dave Smith, PE, QSP, has more than 30 years of experience as Project <br />Manager, Resident Engineer, and Structures Representative on large, <br />Years if Experience <br />multi -staged, multi -phased public works projects. Dave has a strong <br />30 Years with Berg <br />background in Public Works standards and procedures and delivers <br />Length of Time with the <br />superior service in a complex management role. His attention to <br />detail and thorough knowledge of construction practices means that the <br />Company <br />City of Santa Ana will have a well -run job with a quality end product. His <br />23 Years with Berg <br />career began at the Caltrans District 8 Bridge Department. With Berg <br />Licenses, Registrations and <br />since 1997, he has successfully managed construction of roadway <br />Certificates <br />improvements, water lines, pump stations, railroad bridges, grade <br />Registered Professional <br />separations, highway interchanges, dredging, wharf improvements, <br />Engineer, Civil, CA, No. C54625 <br />and rail projects. <br />Qualified SWPPP Developer/ <br />Work History <br />Practitioner (QSD/QSP) No. <br />23451 <br />Resident Engineer, Fullerton Road Grade Separation, San Gabriel <br />Valley Council of Governments (SGVCOG)/Alameda Corridor East <br />Metrolink Roadway Worker <br />Construction Authority (ACE), City of Industry, CA. Berg & Associates, <br />Protection Training <br />Inc. Aug. 2019 —July 2021. Dave provided resident engineering for this <br />Metrolink Third -Party <br />$84 million grade separation project in the City of Industry that involves <br />Contractors Safety Training <br />over 14,000 feet of railroad track construction, over 10,000 feet of <br />retaining wall construction, 3 bridges structures (UPRR, roadway, and <br />BNSF Roadway Worker <br />pedestrian), and an extensive, deep sewer and storm drain with <br />Protection Training <br />dewatering measures. This complex 5-stage project has 19 phases <br />Foundations and Shoring <br />that require the closure of the City's main thoroughfare while <br />four - <br />Fullerton Road is lowered under the existing UPRR tracks and a four- <br />Pavement and Quality <br />track railroad bridge is built. Dave reviewed and responded to <br />Control Professional <br />C <br />Co <br />contractor requests for information, provided stakeholder management, <br />Certificate <br />and third -party utility coordination with the Water Department, Verizon, <br />Lead Supervisor and Worker <br />and Southern California Edison. He oversaw construction management <br />Training <br />staff and provided quality assurance and project administration. <br />Caltrans "Just in Time <br />Resident Engineer, Raymond Avenue Grade Separation, City of <br />Training" (JITT) <br />Fullerton/Orange County Transportation Authority (OCTA), <br />Educational Background <br />Fullerton, CA. Berg & Associates, Inc. Aug. 2013 — Jul. 2019. Dave <br />BS Civil Engineering, California <br />lead the Berg construction management team for this $45 million <br />State Polytechnic University <br />Orange County Transportation Authority (OCTA) BNSF grade <br />Pomona, 1992 <br />separation. The project eliminated the at -grade railroad crossing to <br />facilitate better traffic flow and increase safety for vehicles and <br />pedestrians. Work included major utility relocations, rail and <br />Berg & Associates Inc. <br />