Laserfiche WebLink
Office Engineer, Fullerton Road Grade Separation, San Gabriel Valley Council of Governments <br />(SGVCOG)/Alameda Corridor East (ACE), City of Industry, CA. Berg & Associates, Inc. 2018 — Apr. 2019. <br />This $84 million grade separation project in the City of Industry involves over 14,000 feet of railroad track <br />construction, over 10,000 feet of retaining wall construction, 3 bridges structures (UPRR, roadway, and <br />pedestrian), and an extensive, deep sewer and storm drain with dewatering measures. This complex 5-stage <br />project has 19 phases that require the closure of the City's main thoroughfare while Fullerton Road is lowered <br />under the existing UPRR tracks and a four -track railroad bridge is built. Ryan monitored all payments to the <br />Contractor, generated and drafted contract changes order and field directives, provided draft monthly RE <br />reports and weekly progress reports, and tracked utility work to integrate with Contractor's schedule. <br />Relationship Manager/Jr. Underwriter, Sun West Mortgage Company, Inc., Corona, CA. 2016 — 2018. <br />Ryan analyzed and recorded all incoming documents for compliance and loan eligibility. He verified and <br />validated supporting income, assets and liabilities, reviewed and verified credit reports, input and updated <br />mortgage applications on all first mortgage loans; VA and FHA, maintained open communication with <br />customers, real estate brokers and loan officers to ensure proper and timely processing and submission of <br />mortgage applications and sent and follow- up on verifications to employers, banks, and creditors. Ryan <br />also provided status reports on each mortgage indicating process to the loan officers and brokers <br />Quality Control Inspector, RH Peterson Company, Industry, CA. 2015 — 2016. Ryan approved incoming <br />materials by confirming specifications, conducted visual and measurement tests and rejected and returned <br />unacceptable materials. Ryan also approved in -process production by confirming specifications, <br />communicated required adjustments to production supervisor, approved finished products, returned <br />products for re -work, confirmed re -work, documented inspection results by completing reports and logs, <br />summarized re -work and waste, inputted data into quality database and kept measurement equipment <br />operating by following operating instructions. <br />Roadway Inspector/Office Engineer, 1-10 Monterey Avenue Interchange Project, City of Palm Desert, <br />Palm Desert, CA. Dynamic Engineering Services, Inc. 2014 — 2015. The City of Palm Desert, in cooperation <br />with CVAG, Riverside County and Caltrans, widened the existing westbound on -ramp, added ramp metering <br />and landscape to this interchange. Ryan generated monthly bid quantity sheets for the monthly payments. <br />Attended weekly contractor's progress meetings and prepared meeting minutes. Under the supervision of <br />the Resident Engineer/Structures Representative, inspected the following work: SWPPP roadway, traffic <br />control, grading, electrical, Metal Beam Guard Rails (MBGR), Drainage, driven Piles, Retaining Walls, <br />Abutments, Tieback Walls, Slope Paving, complete inspection. <br />SWPPP/Construction Inspector, 1-15/Duncan Canyon Road Interchange Improvements, City of Fontana, <br />Fontana, CA. Caltrop Corporation. 2013 — 2014. The City of Fontana, in cooperation with Caltrans, <br />modified the existing two-lane Duncan Canyon Road Overcrossing, which is between the existing Summit <br />Avenue and Sierra Avenue Interchanges, into a new four -lane interchange over the Interstate 15 (1-15). <br />Ryan provided administrative assistance to the construction management staff; maintaining project files; <br />compiled monthly construction progress reports; coordinated with contractor field personnel on force <br />account payments. Generated monthly bid quantity sheets for the monthly payments. Attended weekly <br />contractor's progress meetings and preparing meeting minutes; under the supervision of the Resident <br />Engineer/Structures Representative inspected the following work SWPPP roadway, traffic control, grading, <br />electrical, Metal Beam Guard Rails (MBGR), Drainage, driven Piles, Retaining Walls, Abutments, Tieback <br />Walls, Slope Paving, as well as completing inspection diaries. <br />Office Engineer/Construction Inspector, 1-5 Mitigation Phase 2 Street Improvement, Norwalk <br />Boulevard/San Antonio Drive, Norwalk, CA. Caltrop Corporation. 2013 — 2014. Ryan provided <br />administrative assistance to the construction management staff, maintained project files, compiled <br />Berg & Associates Inc. <br />