Laserfiche WebLink
Position with the Company <br />Inspector/Water Specialist <br />Years of Experience <br />40 Years of Experience <br />Length of Time with the <br />Company <br /><1 Years with Berg <br />Licenses, Registrations and <br />Certificates <br />OSHA 10-Hour Construction <br />T-Lock Welding (Ameron) <br />SWPPP Training <br />Confined Space Training <br />NASSCO Certified <br />Educational Background <br />Water Distribution and Water <br />JOHN MARTIN <br />Peak/Alternate Inspector <br />Experience <br />John brings over 40 years of experience in water infrastructure <br />including inspection of water, recycled water, sewers, and public <br />works projects. He has experience working with the Orange County <br />Water Department, the Orange County Sanitation District, and the <br />Long Beach Water Department. He serves as a valuable resource for <br />peak and alternate inspection services as his career has progressed <br />steadily from maintenance worker, field supervisor, treatment plant <br />operator, district inspector, construction observer, and inspector. <br />Work History <br />Construction Inspector, Wallace & Associates, Corona, CA. Oct. 2018 <br />—Jan. 2020. John inspected the installation of SDR 35 sewer main and <br />5,000 ft of C900 watermain. He also inspected the installation of 6' fire <br />hydrants. <br />Construction Inspector, Joe Hill Consulting Engineers, San Francisco, <br />CA. Sept. 2020—Jun. 2021. John inspected tie-ins from a new 12-inch <br />DIP watermain to the existing 12-DIP watermain. <br />Treatment, Santiago Construction Inspector, Wastewater Reclamation Project Phase 1, <br />Community College High Desert Water District, Arcadis Engineering, Yucca Valley, CA. <br />Software Oct. 2016 — Jan. 2018. John inspected the installation of 10 miles of <br />Procore, EaDoc, Tracklt 8-inch SDR 35 sewer main along with over 500 4-inch to 6-inch SDR 35 <br />sewer laterals. He inspected the installation of over 300 performed <br />sewer manholes, the installation of 3000 feet of 20-inch force main and was part of the inspection team <br />overseeing two jack and bore operations for the force main and main line sewer. <br />Construction Inspector, Albert A Webb Associates, Riverside, CA. May 2012 — May 2016. <br />• Rosewood CT & J Street Water Main Replacement Project: This project included inspection of 3,300 <br />feet of 30inch CIVIL/ C WSP, 3,100 feet 18-inch CML/C WSP, 2,700 feet 18-inch DIP, three 24-inch <br />manways on the 30-inch CIVIL, 65 new water services, 17 new fire hydrants, 9 Cathodic test stations, <br />and 30 butterfly valves. <br />• West 4th street Elderberry to San Antonio Ave Water Main Improvement Project: This project <br />included inspection of 4,300 feet of 18-inch CML/C WSP, 130 fire hydrants, 7 cathodic test stations, <br />200 feet 10-inch and 8-inch CML/C WSP, four 18-inch butterfly valves, and 37 water services. <br />• Water Main Replacement Project in Various Streets: This project included inspection of 4,200 feet <br />12-inch CML/C WSP, 6,400 feet 8-inch CML/C WSP, 214,000 SF grind and cap, 24 Gate Valves, 89 <br />water services, 26 fire hydrants <br />Berg & Associates Inc. <br />